← VOTORANTIM CIMENTOS

VOTORANTIM CIMENTOS safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Safety defects; examination, correction and records.

    violationRecord 5110667
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.14100(b) · $245.00 proposed penalty

  2. Securing gas cylinders.

    violationRecord 5110803
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.16005 · $151.00 proposed penalty

  3. High-pressure hose connections.

    violationRecord 5110664
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.13021 · $336.00 proposed penalty

  4. Danger signs.

    violationRecord 5110663
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.12021 · $549.00 proposed penalty

  5. Securing movable parts.

    violationRecord 8842800
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.14206(b) · $151.00 proposed penalty

  6. Inspection and cover plates.

    violationRecord 5110802
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.12032 · Significant and substantial (S&S) · $366.00 proposed penalty

  7. General requirements.

    violationRecord 5110801
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  8. Insulation and fittings for power wires and cables.

    violationRecord 5110662
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.12008 · $165.00 proposed penalty

  9. Securing gas cylinders.

    violationRecord 5110661
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.16005 · $245.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 5110660
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.14112(a) · $245.00 proposed penalty

  11. Housekeeping.

    violationRecord 5110659
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  12. Barricades and warning signs.

    violationRecord 5110658
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.20011 · $165.00 proposed penalty

  13. High-pressure hose connections.

    violationRecord 5110657
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.13021 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  14. Securing gas cylinders.

    violationRecord 8842798
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.16005 · $151.00 proposed penalty

  15. Insulation and fittings for power wires and cables.

    violationRecord 5110656
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.12008 · $165.00 proposed penalty

  16. Insulation and fittings for power wires and cables.

    violationRecord 5110655
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.12008 · $549.00 proposed penalty

  17. Housekeeping.

    violationRecord 5110654
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  18. Securing gas cylinders.

    violationRecord 8842797
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.16005 · $151.00 proposed penalty

  19. Protection of gas cylinder valves.

    violationRecord 8842796
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.16006 · $151.00 proposed penalty

  20. Inspection.

    violationRecord 8842795
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.4201(a)(2) · $209.00 proposed penalty

  21. Closure of valves.

    violationRecord 8842794
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.4603(b) · $151.00 proposed penalty

  22. Housekeeping.

    violationRecord 5110653
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 5110652
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.14112(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  24. High-pressure hose connections.

    violationRecord 5110651
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.13021 · $504.00 proposed penalty

  25. Inspection and cover plates.

    violationRecord 5110650
    St. Marys Cement-Charlevoix · 2000038

    30 CFR 56.12032 · $755.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.