VOTORANTIM CIMENTOS safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Brakes.
St. Marys Cement-Charlevoix · 200003830 CFR 56.14101(a)(2) · $697.00 proposed penalty
Brakes.
St. Marys Cement-Charlevoix · 200003830 CFR 56.14101(b)(1) · $697.00 proposed penalty
Brakes.
St. Marys Cement-Charlevoix · 200003830 CFR 56.14101(a)(2) · $697.00 proposed penalty
Horns and backup alarms.
St. Marys Cement-Charlevoix · 200003830 CFR 56.14132(b)(1) · $697.00 proposed penalty
Access to stationary electrical equipment or switchgear.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12019 · $1,550.00 proposed penalty
Inspection and cover plates.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12032 · $1,126.00 proposed penalty
Protection of gas cylinder valves.
St. Marys Cement-Charlevoix · 200003830 CFR 56.16006 · $1,320.00 proposed penalty
Housekeeping.
St. Marys Cement-Charlevoix · 200003830 CFR 56.20003(a) · Significant and substantial (S&S) · $10,569.00 proposed penalty
Identification of power switches.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12018 · $1,126.00 proposed penalty
Moving machine parts.
St. Marys Cement-Charlevoix · 200003830 CFR 56.14107(a) · $697.00 proposed penalty
Electrical conductors.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12004 · $1,431.00 proposed penalty
Inspection and cover plates.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12032 · $3,736.00 proposed penalty
Disorders (repeated trauma)
St. Marys Cement-Charlevoix · 2000038Occupatnal illness not deg 1-6
Accident narrative
While moving fire extinguishers for inspection the employees' hands cramped up and was unable to get EE's fingers straight.
Impoundment Spot Inspection
St. Marys Cement-Charlevoix · 20000381.8 on-site hours reported
Horns and backup alarms.
St. Marys Cement-Charlevoix · 200003830 CFR 56.14132(b)(1) · $504.00 proposed penalty
Locking transformer enclosures.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12068 · $1,550.00 proposed penalty
Identification of power switches.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12018 · $3,736.00 proposed penalty
General requirements.
St. Marys Cement-Charlevoix · 200003830 CFR 56.4200(b)(2) · $1,037.00 proposed penalty
Danger signs.
St. Marys Cement-Charlevoix · 200003830 CFR 56.12021 · $1,550.00 proposed penalty
Regular Safety and Health Inspection
Byron West-Limestone · 11029675.0 on-site hours reported
High-pressure hose connections.
St. Marys Cement-Charlevoix · 200003830 CFR 56.13021 · $1,550.00 proposed penalty
Air receiver tanks.
St. Marys Cement-Charlevoix · 200003830 CFR 56.13011 · $697.00 proposed penalty
Air receiver tanks.
St. Marys Cement-Charlevoix · 200003830 CFR 56.13011 · $697.00 proposed penalty
Protection of gas cylinder valves.
St. Marys Cement-Charlevoix · 200003830 CFR 56.16006 · $1,431.00 proposed penalty
Securing gas cylinders.
St. Marys Cement-Charlevoix · 200003830 CFR 56.16005 · $959.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.