Thorberg Collectorate Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Escapeways; bituminous and lignite mines.
Magnum #2 · 151986930 CFR 75.380(d)(7)(v) · $151.00 proposed penalty
Spot Inspection
Putney Darby Mine #1 · 15198270.3 on-site hours reported
Rock dusting.
Magnum #2 · 151986930 CFR 75.402 · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Magnum #2 · 151986930 CFR 75.380(d)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
Magnum #2 · 151986930 CFR 75.400 · $151.00 proposed penalty
Ventilation controls.
Magnum #2 · 151986930 CFR 75.333(h) · $151.00 proposed penalty
Fall of face/rib/pillar/side/highwall
Coalgood Darby 1 · 1519939Accident only
Accident narrative
Had a highwall failure on the surface area, between #3 & #4 drift mouth entries. The incident occurred from repeated freezing/thawing of the high wall. The rock measured approx. 30' tall X approx. 2' to 20' wide at its widest point X inches to 8' thick at its deepest point. All employees were withdrawn safely. The incident was reported to the 24 Hr. Reporting Hotline.
Spot Inspection
Moore Processing · 15052156.0 on-site hours reported
Non-Injury Accident Investigation
Coalgood Darby 1 · 151993911.3 on-site hours reported
Violation — cited standard not reported
Coalgood Darby 1 · 1519939Water sprinkler systems; fire warning devices at belt drives.
Magnum #2 · 151986930 CFR 75.1101-10 · $151.00 proposed penalty
Accumulation of combustible materials.
Magnum #2 · 151986930 CFR 75.400 · $151.00 proposed penalty
Type and quality of firefighting equipment.
Magnum #2 · 151986930 CFR 75.1100-1(a) · $151.00 proposed penalty
Physical requirements for mine rescue team.
Magnum #2 · 151986930 CFR 49.17(a) · $165.00 proposed penalty
Requirements for large coal mines.
Magnum #2 · 151986930 CFR 49.40 · $959.00 proposed penalty
Loading and haulage equipment; operation.
Magnum #2 · 151986930 CFR 77.1607(n) · $151.00 proposed penalty
Violation — cited standard not reported
Magnum #2 · 1519869$168.00 proposed penalty
Accumulations of combustible materials.
Coalgood Darby 1 · 151993930 CFR 77.1104
Loading and haulage equipment; inspection and maintenance.
Coalgood Darby 1 · 151993930 CFR 77.1606(c)
Loading and haulage equipment; installations.
Coalgood Darby 1 · 151993930 CFR 77.1605(a)
Accumulations of combustible materials.
Coalgood Darby 1 · 151993930 CFR 77.1104 · Significant and substantial (S&S) · $252.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coalgood Darby 1 · 151993930 CFR 77.1606(c) · $168.00 proposed penalty
Loading and haulage equipment; installations.
Coalgood Darby 1 · 151993930 CFR 77.1605(a) · $168.00 proposed penalty
Mechanical equipment guards.
Coalgood Darby 1 · 151993930 CFR 77.400(c) · Significant and substantial (S&S) · $336.00 proposed penalty
Travelways at surface installations.
Coalgood Darby 1 · 151993930 CFR 77.205(b) · Significant and substantial (S&S) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.