← Sibanye Stillwater Limited

Sibanye Stillwater Limited safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Securing gas cylinders.

    violationRecord 5054643
    STILLWATER MINE · 2401490

    30 CFR 57.16005 · $432.00 proposed penalty

  2. Safety defects; examination, correction and records.

    violationRecord 5054642
    STILLWATER MINE · 2401490

    30 CFR 57.14100(b) · $165.00 proposed penalty

  3. Testing grounding systems.

    violationRecord 5054641
    STILLWATER MINE · 2401490

    30 CFR 57.12028 · $1,126.00 proposed penalty

  4. Testing grounding systems.

    violationRecord 5054640
    STILLWATER MINE · 2401490

    30 CFR 57.12028 · $1,126.00 proposed penalty

  5. Refuge areas.

    violationRecord 5212102
    STILLWATER MINE · 2401490

    30 CFR 57.11052(d) · $697.00 proposed penalty

  6. Emergency communications system.

    violationRecord 5212101
    STILLWATER MINE · 2401490

    30 CFR 57.18013 · $697.00 proposed penalty

  7. Safe access.

    violationRecord 5054492
    STILLWATER MINE · 2401490

    30 CFR 57.11001 · $432.00 proposed penalty

  8. Testing grounding systems.

    violationRecord 5054639
    STILLWATER MINE · 2401490

    30 CFR 57.12028 · $1,126.00 proposed penalty

  9. Machinery, equipment, and tools.

    violationRecord 5054491
    STILLWATER MINE · 2401490

    30 CFR 57.14205 · $209.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5054490
    STILLWATER MINE · 2401490

    30 CFR 57.12032 · $366.00 proposed penalty

  11. Housekeeping.

    violationRecord 9340083
    STILLWATER MINE · 2401490

    30 CFR 57.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  12. Housekeeping.

    violationRecord 9340082
    STILLWATER MINE · 2401490

    30 CFR 57.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  13. Correction of hazardous conditions.

    violationRecord 9340081
    STILLWATER MINE · 2401490

    30 CFR 57.3200 · $398.00 proposed penalty

  14. Correction of hazardous conditions.

    violationRecord 9340080
    STILLWATER MINE · 2401490

    30 CFR 57.3200 · $267.00 proposed penalty

  15. Warning signs.

    violationRecord 5054638
    STILLWATER MINE · 2401490

    30 CFR 57.4101 · $209.00 proposed penalty

  16. Testing grounding systems.

    violationRecord 5054637
    STILLWATER MINE · 2401490

    30 CFR 57.12028 · $1,126.00 proposed penalty

  17. Inspection and cover plates.

    violationRecord 5054636
    STILLWATER MINE · 2401490

    30 CFR 57.12032 · $1,219.00 proposed penalty

  18. General requirements.

    violationRecord 5054489
    STILLWATER MINE · 2401490

    30 CFR 57.4200(b)(2) · $697.00 proposed penalty

  19. Inspection and cover plates.

    violationRecord 9340079
    STILLWATER MINE · 2401490

    30 CFR 57.12032 · $1,320.00 proposed penalty

  20. Safe access.

    violationRecord 9340078
    STILLWATER MINE · 2401490

    30 CFR 57.11001 · $432.00 proposed penalty

  21. Inspection and cover plates.

    violationRecord 9340077
    STILLWATER MINE · 2401490

    30 CFR 57.12032 · $1,320.00 proposed penalty

  22. Testing grounding systems.

    violationRecord 5054635
    STILLWATER MINE · 2401490

    30 CFR 57.12028 · $504.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 5054634
    STILLWATER MINE · 2401490

    30 CFR 57.12008 · $697.00 proposed penalty

  24. Construction and maintenance of ventilation doors.

    violationRecord 5054487
    STILLWATER MINE · 2401490

    30 CFR 57.8531(e) · $177.00 proposed penalty

  25. Barricades and warning signs.

    violationRecord 5054486
    STILLWATER MINE · 2401490

    30 CFR 57.20011 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.