← Sibanye Stillwater Limited

Sibanye Stillwater Limited safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection.

    violationRecord 5050643
    EAST BOULDER MINE · 2401879

    30 CFR 57.4201(a)(2) · $151.00 proposed penalty

  2. Non-Fatal Accident Investigation

    inspectionRecord F002595
    STILLWATER MINE · 2401490

    128.3 on-site hours reported

  3. Violation — cited standard not reported

    violationRecord 9909678
    STILLWATER MINE · 2401490
  4. Housekeeping.

    violationRecord 5050642
    EAST BOULDER MINE · 2401879

    30 CFR 57.20003(a) · $151.00 proposed penalty

  5. Securing gas cylinders.

    violationRecord 5050641
    EAST BOULDER MINE · 2401879

    30 CFR 57.16005 · $151.00 proposed penalty

  6. Stacking and storage of materials.

    violationRecord 5050640
    EAST BOULDER MINE · 2401879

    30 CFR 57.16001 · $165.00 proposed penalty

  7. Fall of roof or back

    accidentRecord 220251110031
    STILLWATER MINE · 2401490

    Accident only

    Accident narrative

    A miner traveled into the 56E 16,000 A2 lower stope to gather supplies. Miner observed the FOG and reported it to the night shift GF. The area was barricaded to prevent entry.

  8. Handling of materials

    accidentRecord 220251050013
    EAST BOULDER MINE · 2401879

    Days away from work only

    Accident narrative

    Employee reports was changing steering valve assembly (approx 50 lbs). Set unit on mucker hood to continue work. It fell off the hood contacting employee's right pointer finger resting on mucker frame, causing a blow out type injury and fracturing the tip.

  9. First aid materials.

    violationRecord 9909677
    EAST BOULDER MINE · 2401879

    30 CFR 57.15001 · $151.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 9822797
    EAST BOULDER MINE · 2401879

    30 CFR 57.14112(a)(1) · $151.00 proposed penalty

  11. High-pressure hose connections.

    violationRecord 9822796
    EAST BOULDER MINE · 2401879

    30 CFR 57.13021 · $818.00 proposed penalty

  12. Design, installation, and maintenance of railroads.

    violationRecord 9822795
    EAST BOULDER MINE · 2401879

    30 CFR 57.9307 · $165.00 proposed penalty

  13. Fall of roof or back

    accidentRecord 220251110029
    EAST BOULDER MINE · 2401879

    Accident only

    Accident narrative

    A FOG occurred in the 72 740 +280 west panel heading. The miner was remote mucking at the time when the back fell in. There was no injury.

  14. Design, installation, and maintenance of railroads.

    violationRecord 9822794
    EAST BOULDER MINE · 2401879

    30 CFR 57.9307 · $165.00 proposed penalty

  15. Location of self-rescue devices.

    violationRecord 5050639
    EAST BOULDER MINE · 2401879

    30 CFR 57.15031(a) · $245.00 proposed penalty

  16. Slip or fall of person

    accidentRecord 220251060001
    EAST BOULDER MINE · 2401879

    Days away from work only

    Accident narrative

    While stepping out of pick-up employee slipped on small frozen puddle. Employee fell congtacting pick-up causing fracture to left forearm. Employee was given light duty restrictions and returned to work on next scheduled shift.

  17. Safe access.

    violationRecord 9909676
    EAST BOULDER MINE · 2401879

    30 CFR 57.11001 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  18. Correction of dangerous conditions.

    violationRecord 9822793
    EAST BOULDER MINE · 2401879

    30 CFR 57.12030 · $549.00 proposed penalty

  19. Controls and switches.

    violationRecord 9822792
    EAST BOULDER MINE · 2401879

    30 CFR 57.12002 · $549.00 proposed penalty

  20. Auxiliary facilities.

    violationRecord 9822790
    EAST BOULDER MINE · 2401879

    30 CFR 57.6161(b)(2) · $549.00 proposed penalty

  21. Parking procedures for unattended equipment.

    violationRecord 5050638
    EAST BOULDER MINE · 2401879

    30 CFR 57.14207 · $151.00 proposed penalty

  22. Emergency communications system.

    violationRecord 9909675
    EAST BOULDER MINE · 2401879

    30 CFR 57.18013 · $549.00 proposed penalty

  23. Emergency communications system.

    violationRecord 9822791
    EAST BOULDER MINE · 2401879

    30 CFR 57.18013 · $549.00 proposed penalty

  24. Auxiliary facilities.

    violationRecord 5050637
    EAST BOULDER MINE · 2401879

    30 CFR 57.6161(b)(3) · $549.00 proposed penalty

  25. Spillage and leakage.

    violationRecord 5050636
    EAST BOULDER MINE · 2401879

    30 CFR 57.4102 · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.