← Sibanye Stillwater Limited

Sibanye Stillwater Limited safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F0150D5
    EAST BOULDER MINE · 2401879

    8.3 on-site hours reported

  2. Safety defects; examination, correction and records.

    violationRecord 5054167
    EAST BOULDER MINE · 2401879

    30 CFR 57.14100(d) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  3. Ground support use.

    violationRecord 5054164
    EAST BOULDER MINE · 2401879

    30 CFR 57.3360 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  4. Non-Injury Accident Investigation

    inspectionRecord F0150D4
    EAST BOULDER MINE · 2401879

    9.8 on-site hours reported

  5. Fall of roof or back

    accidentRecord 220252100006
    EAST BOULDER MINE · 2401879

    Accident only

    Accident narrative

    Upon performing a post blast inspection at the start of night shift, a miner identified material that had fallen approximately 50' from blast area. Miner notified supervisor, incident was confirmed to meet the criteria of immediately reportable. Area was barricaded to prevent entry.

  6. Provision and maintenance of self-rescue devices.

    violationRecord 5055048
    EAST BOULDER MINE · 2401879

    30 CFR 57.15030 · $2,133.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5055047
    EAST BOULDER MINE · 2401879

    30 CFR 57.14112(b) · $165.00 proposed penalty

  8. Safety defects; examination, correction and records.

    violationRecord 5055046
    EAST BOULDER MINE · 2401879

    30 CFR 57.14100(c) · $245.00 proposed penalty

  9. Equipment and maintenance requirements.

    violationRecord 5054676
    EAST BOULDER MINE · 2401879

    30 CFR 49.6(a)(5) · $151.00 proposed penalty

  10. Horns and backup alarms for surface equipment.

    violationRecord 5054315
    EAST BOULDER MINE · 2401879

    30 CFR 57.14132(a) · $165.00 proposed penalty

  11. Inspection.

    violationRecord 5054314
    EAST BOULDER MINE · 2401879

    30 CFR 57.4201(a)(1) · $165.00 proposed penalty

  12. Portable rigid ladders.

    violationRecord 5054313
    EAST BOULDER MINE · 2401879

    30 CFR 57.11004 · Significant and substantial (S&S) · $366.00 proposed penalty

  13. Electrical conductors.

    violationRecord 5054312
    EAST BOULDER MINE · 2401879

    30 CFR 57.12004 · $549.00 proposed penalty

  14. Machinery

    accidentRecord 220252050003
    EAST BOULDER MINE · 2401879

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee reports EE was drilling a reamer hole when the steel shanked. EE was contacted by an object in the shoulder but thought nothing of it. Upon changing out EE noticed a small laceration that required one suture to close.

  15. Electrical conductors.

    violationRecord 5055045
    EAST BOULDER MINE · 2401879

    30 CFR 57.12004 · $245.00 proposed penalty

  16. Electrical conductors.

    violationRecord 5054675
    EAST BOULDER MINE · 2401879

    30 CFR 57.12004 · $245.00 proposed penalty

  17. Parking procedures for unattended equipment.

    violationRecord 5054674
    EAST BOULDER MINE · 2401879

    30 CFR 57.14207 · $245.00 proposed penalty

  18. Moving machine parts.

    violationRecord 5054311
    EAST BOULDER MINE · 2401879

    30 CFR 57.14107(a) · $245.00 proposed penalty

  19. Electrical conductors.

    violationRecord 5055044
    EAST BOULDER MINE · 2401879

    30 CFR 57.12004 · $245.00 proposed penalty

  20. Temporary, portable containers.

    violationRecord 5054673
    EAST BOULDER MINE · 2401879

    30 CFR 47.44(b) · $151.00 proposed penalty

  21. Emergency communications system.

    violationRecord 5055043
    EAST BOULDER MINE · 2401879

    30 CFR 57.18013 · $151.00 proposed penalty

  22. General requirements.

    violationRecord 5054672
    EAST BOULDER MINE · 2401879

    30 CFR 57.4200(b)(2) · $151.00 proposed penalty

  23. Safety defects; examination, correction and records.

    violationRecord 5054671
    EAST BOULDER MINE · 2401879

    30 CFR 57.14100(b) · $151.00 proposed penalty

  24. Spillage and leakage.

    violationRecord 5054670
    EAST BOULDER MINE · 2401879

    30 CFR 57.4102 · $288.00 proposed penalty

  25. Inspection.

    violationRecord 5054503
    EAST BOULDER MINE · 2401879

    30 CFR 57.4201(a)(1) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.