Sibanye Stillwater Limited safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Moving machine parts.
STILLWATER MINE · 240149030 CFR 57.14107(a) · $398.00 proposed penalty
Moving machine parts.
STILLWATER MINE · 240149030 CFR 57.14107(a) · $398.00 proposed penalty
Inspection.
STILLWATER MINE · 240149030 CFR 57.4201(a)(2) · $267.00 proposed penalty
Electrical conductors.
STILLWATER MINE · 240149030 CFR 57.12004 · $366.00 proposed penalty
Prohibited areas for food and beverages.
STILLWATER MINE · 240149030 CFR 57.20014 · $267.00 proposed penalty
Inspection.
STILLWATER MINE · 240149030 CFR 57.4201(a)(1) · $465.00 proposed penalty
Access to stationary electrical equipment or switchgear.
STILLWATER MINE · 240149030 CFR 57.12019 · $267.00 proposed penalty
Construction and maintenance of ladders.
STILLWATER MINE · 240149030 CFR 57.11003 · $267.00 proposed penalty
Safe access.
STILLWATER MINE · 240149030 CFR 57.11001 · $504.00 proposed penalty
Protection of power conductors from mobile equipment.
STILLWATER MINE · 240149030 CFR 57.12005 · $883.00 proposed penalty
Surface storage restrictions.
STILLWATER MINE · 240149030 CFR 57.4431(a)(1) · $288.00 proposed penalty
Identification of power switches.
STILLWATER MINE · 240149030 CFR 57.12018 · $883.00 proposed penalty
Requirement for container labels.
STILLWATER MINE · 240149030 CFR 47.41(a) · $151.00 proposed penalty
Inspection.
STILLWATER MINE · 240149030 CFR 57.4201(a)(1) · $151.00 proposed penalty
Requirement for container labels.
STILLWATER MINE · 240149030 CFR 47.41(a) · $267.00 proposed penalty
Inspection and cover plates.
STILLWATER MINE · 240149030 CFR 57.12032 · $9,004.00 proposed penalty
First aid materials.
STILLWATER MINE · 240149030 CFR 57.15001 · $177.00 proposed penalty
Storage of hazardous materials.
STILLWATER MINE · 240149030 CFR 57.16003 · $267.00 proposed penalty
Fixed ladder landings.
STILLWATER MINE · 240149030 CFR 57.11006 · $267.00 proposed penalty
Identification of power switches.
STILLWATER MINE · 240149030 CFR 57.12018 · $4,383.00 proposed penalty
Inspection and cover plates.
STILLWATER MINE · 240149030 CFR 57.12032 · $1,818.00 proposed penalty
Insulation and fittings for power wires and cables.
STILLWATER MINE · 240149030 CFR 57.12008 · $4,383.00 proposed penalty
Inspection and cover plates.
STILLWATER MINE · 240149030 CFR 57.12032 · $818.00 proposed penalty
First aid materials.
STILLWATER MINE · 240149030 CFR 57.15001 · $267.00 proposed penalty
Correction of dangerous conditions.
STILLWATER MINE · 240149030 CFR 57.12030 · $883.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.