← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 5084239
    BEAR BRANCH 2 · 1518565

    30 CFR 75.512 · $366.00 proposed penalty

  2. Ventilation controls.

    violationRecord 5084238
    BEAR BRANCH 2 · 1518565

    30 CFR 75.333(d)(3) · $226.00 proposed penalty

  3. Ventilation controls.

    violationRecord 5084237
    BEAR BRANCH 2 · 1518565

    30 CFR 75.333(d)(3) · $226.00 proposed penalty

  4. Other safeguards.

    violationRecord 5084236
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1403 · $226.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5029057
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,679.00 proposed penalty

  6. Refuge alternatives.

    violationRecord 5028527
    EAGLE #3 MINE · 4609427

    30 CFR 75.1506(c)(1) · $151.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5021212
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

  8. Impoundment Spot Inspection

    inspectionRecord F014C73
    No. 64 Plant · 1516353

    8.5 on-site hours reported

  9. Regular Safety and Health Inspection

    inspectionRecord 6320450
    Flying Eagle · 4609471

    218.5 on-site hours reported

  10. Quarterly sampling; mechanized mining units.

    violationRecord 5025207
    Coal Branch No.1 Mine · 4609588

    30 CFR 70.208(a)(2) · $549.00 proposed penalty

  11. Quarterly sampling; mechanized mining units.

    violationRecord 5025206
    Coal Branch No.1 Mine · 4609588

    30 CFR 70.208(a)(2) · $549.00 proposed penalty

  12. Quarterly sampling; designated areas.

    violationRecord 5025205
    Coal Branch No.1 Mine · 4609588

    30 CFR 70.209(a) · $288.00 proposed penalty

  13. Quarterly sampling; mechanized mining units.

    violationRecord 5025204
    Coal Branch No.1 Mine · 4609588

    30 CFR 70.208(a)(2) · $549.00 proposed penalty

  14. Quarterly sampling; mechanized mining units.

    violationRecord 5025203
    Coal Branch No.1 Mine · 4609588

    30 CFR 70.208(a)(2) · $549.00 proposed penalty

  15. Quarterly sampling; mechanized mining units.

    violationRecord 5025202
    COAL BRANCH NO. 2 · 4609663

    30 CFR 70.208(a)(2) · $592.00 proposed penalty

  16. Quarterly sampling; mechanized mining units.

    violationRecord 5025201
    COAL BRANCH NO. 2 · 4609663

    30 CFR 70.208(a)(2) · $592.00 proposed penalty

  17. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5029931
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-1(a)(1) · $366.00 proposed penalty

  18. Preshift examination at fixed intervals.

    violationRecord 5024165
    NORTH EAGLE MINE · 4608759

    30 CFR 75.360(g) · $2,712.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F00E8A8
    Freelandville Mine · 1202167

    1.3 on-site hours reported

  20. Impoundment Spot Inspection

    inspectionRecord F014C72
    Thunder Ridge · 1517746

    7.0 on-site hours reported

  21. Spot Inspections

    inspectionRecord F00EB3B
    Speed Mine · 4605437

    103(i) · 6.0 on-site hours reported

  22. Daily inspection of surface coal mine; certified person; reports of inspection.

    violationRecord 5028381
    Rocklick Preparation Plant · 4606448

    30 CFR 77.1713(a) · $193.00 proposed penalty

  23. Escapeways; bituminous and lignite mines.

    violationRecord 5024164
    NORTH EAGLE MINE · 4608759

    30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5028525
    EAGLE #3 MINE · 4609427

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  25. Permissible electric face equipment; maintenance.

    violationRecord 5028524
    EAGLE #3 MINE · 4609427

    30 CFR 75.503 · $313.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.