← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Belt air course ventilation.

    violationRecord 9776387
    Calvary No 81 · 1512753

    30 CFR 75.350(a)(2) · $151.00 proposed penalty

  2. Mechanical equipment guards.

    violationRecord 9776386
    Calvary No 81 · 1512753

    30 CFR 77.400(a) · $151.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5029061
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5029060
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  5. Roof control plan.

    violationRecord 5029059
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5029058
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.202(a) · Significant and substantial (S&S) · $17,082.00 proposed penalty

  7. Power wires and cables; insulation and protection.

    violationRecord 5028685
    Speed Mine · 4605437

    30 CFR 75.517 · Significant and substantial (S&S) · $10,569.00 proposed penalty

  8. Loading and haulage equipment; operation.

    violationRecord 5028382
    Rocklick Preparation Plant · 4606448

    30 CFR 77.1607(bb) · $245.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 5028078
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512 · $549.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5028077
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512 · $245.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5028076
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  12. On-shift examination.

    violationRecord 5028075
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.362(a)(2) · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5020404
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $465.00 proposed penalty

  14. Electric equipment; examination, testing and maintenance.

    violationRecord 5028530
    EAGLE #3 MINE · 4609427

    30 CFR 75.512 · $1,320.00 proposed penalty

  15. Escapeways; bituminous and lignite mines.

    violationRecord 5028529
    EAGLE #3 MINE · 4609427

    30 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5028528
    EAGLE #3 MINE · 4609427

    30 CFR 75.400 · $398.00 proposed penalty

  17. Permissible electric face equipment; maintenance.

    violationRecord 5025890
    Winchester 2 · 4609615

    30 CFR 75.503 · $366.00 proposed penalty

  18. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 5025889
    Winchester 2 · 4609615

    30 CFR 75.1107-7(b) · $151.00 proposed penalty

  19. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5025888
    Winchester 2 · 4609615

    30 CFR 75.1107-4(c) · $151.00 proposed penalty

  20. Condition and examination of firefighting equipment.

    violationRecord 5021214
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.1100-3 · $209.00 proposed penalty

  21. Condition and examination of firefighting equipment.

    violationRecord 5021213
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.1100-3 · $209.00 proposed penalty

  22. Spot Inspections

    inspectionRecord 6319300
    NORTH EAGLE MINE · 4608759

    103(i) · 5.0 on-site hours reported

  23. Regular Safety and Health Inspection

    inspectionRecord F006739
    Coalburg Tunnel Mine · 4608993

    66.0 on-site hours reported

  24. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 5084241
    BEAR BRANCH 2 · 1518565

    30 CFR 75.363(b) · $226.00 proposed penalty

  25. Ventilation controls.

    violationRecord 5084240
    BEAR BRANCH 2 · 1518565

    30 CFR 75.333(b)(3) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.