← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F00CCFA
    Blue Creek Prep Plant · 4609226

    1.5 on-site hours reported

  2. Accumulation of combustible materials.

    violationRecord 5084433
    NO. 77 · 1509636

    30 CFR 75.400 · $398.00 proposed penalty

  3. Atmospheric monitoring systems.

    violationRecord 9776388
    Calvary No 81 · 1512753

    30 CFR 75.351(c)(4) · $165.00 proposed penalty

  4. Ventilation controls.

    violationRecord 5081899
    Calvary No 81 · 1512753

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  5. Automatic fire warning devices; actions and response.

    violationRecord 5081898
    Calvary No 81 · 1512753

    30 CFR 75.1103-5(h) · $165.00 proposed penalty

  6. Permissible electric face equipment; maintenance.

    violationRecord 5084245
    BEAR BRANCH 2 · 1518565

    30 CFR 75.503 · $366.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5084244
    BEAR BRANCH 2 · 1518565

    30 CFR 75.512 · $366.00 proposed penalty

  8. Identification of circuit breakers.

    violationRecord 5084243
    BEAR BRANCH 2 · 1518565

    30 CFR 75.904 · $226.00 proposed penalty

  9. Roof control plan.

    violationRecord 5029937
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5029936
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.503 · $267.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5090035
    Speed Mine · 4605437

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5090034
    Speed Mine · 4605437

    30 CFR 75.400 · $549.00 proposed penalty

  13. Power wires and cables; insulation and protection.

    violationRecord 5090033
    Speed Mine · 4605437

    30 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  14. On-shift examination.

    violationRecord 5090032
    Speed Mine · 4605437

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  15. Inspection of dry powder chemical systems.

    violationRecord 5028253
    Speed Mine · 4605437

    30 CFR 75.1101-22(a) · $465.00 proposed penalty

  16. Identification of circuit breakers.

    violationRecord 5028252
    Speed Mine · 4605437

    30 CFR 75.904 · $1,679.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5028533
    EAGLE #3 MINE · 4609427

    30 CFR 75.1731(a) · $209.00 proposed penalty

  18. Atmospheric monitoring systems.

    violationRecord 5028532
    EAGLE #3 MINE · 4609427

    30 CFR 75.351(n)(3)(i) · $151.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5028531
    EAGLE #3 MINE · 4609427

    30 CFR 75.202(a) · $267.00 proposed penalty

  20. Machinery and equipment; operation and maintenance.

    violationRecord 5027941
    Flying Eagle · 4609471

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  21. Escapeways; bituminous and lignite mines.

    violationRecord 5027940
    Flying Eagle · 4609471

    30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F00EB3D
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 3.0 on-site hours reported

  23. Accumulation of combustible materials.

    violationRecord 5084432
    NO. 77 · 1509636

    30 CFR 75.400 · $398.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9778978
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1731(b) · $226.00 proposed penalty

  25. Permissible electric face equipment; maintenance.

    violationRecord 5084242
    BEAR BRANCH 2 · 1518565

    30 CFR 75.503 · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.