Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1107-1(a)(3)(ii) · $642.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Methane monitors.
Maple Eagle No. 1 Mine · 460423630 CFR 75.342(a)(4) · $366.00 proposed penalty
Violation — cited standard not reported
Maple Eagle No. 1 Mine · 4604236$1,431.00 proposed penalty
Violation — cited standard not reported
Samples Surface Mine · 4607178High-voltage underground equipment; grounding.
Flying Eagle · 460947130 CFR 75.811 · $592.00 proposed penalty
Escapeways; bituminous and lignite mines.
COAL BRANCH NO. 2 · 460966330 CFR 75.380(d)(4) · $313.00 proposed penalty
Non-Fatal Accident Investigation
EAGLE #3 MINE · 46094275.0 on-site hours reported
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $398.00 proposed penalty
Underground electrical installations.
Calvary No 81 · 151275330 CFR 75.340(a)(1)(i) · $193.00 proposed penalty
Accumulation of combustible materials.
Calvary No 81 · 151275330 CFR 75.400 · $193.00 proposed penalty
Preshift examination at fixed intervals.
BEAR BRANCH 2 · 151856530 CFR 75.360(f) · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
NORTH EAGLE MINE · 460875930 CFR 75.202(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Other safeguards.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1403 · Significant and substantial (S&S) · $5,574.00 proposed penalty
Power wires and cables; insulation and protection.
EAGLE #3 MINE · 460942730 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
EAGLE #3 MINE · 460942730 CFR 75.370(a)(1) · $226.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 2.5 on-site hours reported
Regular Safety and Health Inspection
Coal Clean Prep Plant · 4608571125.5 on-site hours reported
Water sprinkler systems; fire warning devices at belt drives.
NO. 77 · 150963630 CFR 75.1101-10 · $165.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $959.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.518-1 · $549.00 proposed penalty
Violation — cited standard not reported
Maple Eagle No. 1 Mine · 4604236$1,219.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Speed Mine · 460543730 CFR 75.601-1 · $245.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.