Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $177.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(k) · $209.00 proposed penalty
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 6.5 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 6.5 on-site hours reported
Spot Inspection
Sycamore Surface Mine · 460705812.0 on-site hours reported
Spot Inspection
Samples Surface Mine · 460717810.0 on-site hours reported
Spot Inspection
Coal Clean Prep Plant · 460857110.5 on-site hours reported
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 7.0 on-site hours reported
Spot Inspection
Samples Mine Highwall Miner · 46091530.5 on-site hours reported
Verbal Hazard Complaint Inspections
EAGLE #3 MINE · 46094273.5 on-site hours reported
Verbal Hazard Complaint Inspections
EAGLE #3 MINE · 46094273.5 on-site hours reported
Permissible electric face equipment; maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.503 · $465.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · $1,126.00 proposed penalty
Protection from falls of roof, face and ribs.
Speed Mine · 460543730 CFR 75.202(a) · $1,126.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Mobile equipment; automatic warning devices.
Coal Clean Prep Plant · 460857130 CFR 77.410(a)(1) · $151.00 proposed penalty
Machinery
Flying Eagle · 4609471Days away from work only
Accident narrative
Employee stated as EE was bolting in 3 left crosscut a rock fell from the top hitting EE in the back.
Spot Inspection
Maple Eagle East Deep Mine · 46094169.3 on-site hours reported
Non-Fatal Accident Investigation
Flying Eagle · 46094715.5 on-site hours reported
Mechanical equipment guards.
Coal Clean Prep Plant · 460857130 CFR 77.400(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
Coal Clean Prep Plant · 460857130 CFR 77.516 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Coal Clean Prep Plant · 460857130 CFR 77.1110 · $151.00 proposed penalty
Accumulations of combustible materials.
Coal Clean Prep Plant · 460857130 CFR 77.1104 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.