  1. Changes in electric system map; recording.

    violationRecord 5080027
    BEAR BRANCH 2 · 1518565

    30 CFR 75.508-2 · $177.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5022942
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $959.00 proposed penalty

  3. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5022941
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1712-3(a) · $336.00 proposed penalty

  4. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5025907
    Speed Mine · 4605437

    30 CFR 75.1107-1(a)(3)(ii) · $336.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 5025906
    Speed Mine · 4605437

    30 CFR 75.517 · Significant and substantial (S&S) · $9,004.00 proposed penalty

  6. Other safeguards.

    violationRecord 5025905
    Speed Mine · 4605437

    30 CFR 75.1403 · Significant and substantial (S&S) · $4,383.00 proposed penalty

  7. Roof bolting.

    violationRecord 5025904
    Speed Mine · 4605437

    30 CFR 75.204(c)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  8. Roof bolting.

    violationRecord 5020427
    Speed Mine · 4605437

    30 CFR 75.204(c)(1) · $336.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5020426
    Speed Mine · 4605437

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  10. Roof bolting.

    violationRecord 5020425
    Speed Mine · 4605437

    30 CFR 75.204(f)(7) · $336.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 5020424
    Speed Mine · 4605437

    30 CFR 75.202(a) · $267.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5027974
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  13. Mechanical equipment guards.

    violationRecord 5189362
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  14. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 5189361
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1103-8(c) · $245.00 proposed penalty

  15. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 5189360
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1103-4(b) · $432.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5189359
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.370(a)(1) · $697.00 proposed penalty

  17. Other safeguards.

    violationRecord 5189358
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1403 · $398.00 proposed penalty

  18. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 5189357
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1103-8(c) · $245.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5029847
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.400 · $245.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 5029846
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.503 · $193.00 proposed penalty

  21. Hazard training.

    violationRecord 5028547
    EAGLE #3 MINE · 4609427

    30 CFR 48.31(a)(1) · $233.00 proposed penalty

  22. Mobile equipment; automatic warning devices.

    violationRecord 5095149
    EAGLE #3 MINE · 4609427

    30 CFR 77.410(c) · $151.00 proposed penalty

  23. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5095148
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  24. Fall of roof or back

    accidentRecord 220260960009
    Maple Eagle No. 1 Mine · 4604236

    Accident only

    Accident narrative

    An unplanned roof fall occurred outby the section loading point above anchorage. The fall is located at #16 crosscut from the #7-#8 entries measuring approximately 90 feet long by 10 foot thick. Supplemental roof support was added in the adjacent entries, and the fall has been breakered off.

  25. Regular Safety and Health Inspection

    inspectionRecord F010776
    NO. 77 · 1509636

    280.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.