Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mobile equipment; automatic warning devices.
Samples Surface Mine · 460717830 CFR 77.410(a)(1) · $165.00 proposed penalty
Mobile equipment; automatic warning devices.
Samples Surface Mine · 460717830 CFR 77.410(c) · $165.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(d) · $313.00 proposed penalty
Machinery and equipment; operation and maintenance.
COAL BRANCH NO. 2 · 460966330 CFR 75.1725(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Spot Inspections
NO. 77 · 1509636103(i) · 5.5 on-site hours reported
Maintenance of incombustible content of rock dust.
Calvary No 81 · 151275330 CFR 75.403 · $151.00 proposed penalty
Atmospheric monitoring systems.
Calvary No 81 · 151275330 CFR 75.351(k) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1100-2(e) · $313.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,818.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $1,431.00 proposed penalty
Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1712-3(c)(2)(iv) · $818.00 proposed penalty
Permissible electric face equipment; maintenance.
Speed Mine · 460543730 CFR 75.503 · $9,757.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $9,004.00 proposed penalty
Protection of trailing cables.
Speed Mine · 460543730 CFR 75.606 · Significant and substantial (S&S) · $6,540.00 proposed penalty
Mobile equipment; automatic warning devices.
Samples Surface Mine · 460717830 CFR 77.410(c) · $165.00 proposed penalty
Transportation of persons; overcrowding.
Samples Surface Mine · 460717830 CFR 77.1604(b) · $165.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Winchester Peerless Rachel Mine · 460925830 CFR 75.601-1 · $151.00 proposed penalty
Roof control plan.
Flying Eagle · 460947130 CFR 75.220(a)(1) · $336.00 proposed penalty
Roof bolting.
Flying Eagle · 460947130 CFR 75.204(c)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $432.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $398.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · $549.00 proposed penalty
Escapeways; bituminous and lignite mines.
Flying Eagle · 460947130 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.