Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(2) · $245.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $5,574.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $755.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · Significant and substantial (S&S) · $7,084.00 proposed penalty
Condition and examination of firefighting equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1100-3 · $245.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
Maple Eagle No. 1 Mine · 460423630 CFR 75.202(a) · $1,037.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $1,431.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $818.00 proposed penalty
Roof control plan.
EAGLE #3 MINE · 460942730 CFR 75.220(a)(1) · $313.00 proposed penalty
Escapeways; bituminous and lignite mines.
Flying Eagle · 460947130 CFR 75.380(d)(7)(iii) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
Flying Eagle · 460947130 CFR 75.1100-2(f) · $288.00 proposed penalty
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 7.0 on-site hours reported
On-shift examination.
NO. 77 · 150963630 CFR 75.362(b) · Significant and substantial (S&S) · $818.00 proposed penalty
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NO. 77 · 150963630 CFR 75.1731(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Mine ventilation plan; submission and approval.
NO. 77 · 150963630 CFR 75.370(a)(1) · $245.00 proposed penalty
Testing, examination, and maintenance of circuit breakers; record.
BEAR BRANCH 2 · 151856530 CFR 75.900-4 · $313.00 proposed penalty
Permissible electric face equipment; maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.503 · $592.00 proposed penalty
Approved circuit schemes.
BEAR BRANCH 2 · 151856530 CFR 75.900-2(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.512 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
East Mac & Nellie · 151896630 CFR 77.1606(c) · $288.00 proposed penalty
Accumulations of combustible materials.
East Mac & Nellie · 151896630 CFR 77.1104 · $209.00 proposed penalty
Accumulations of combustible materials.
East Mac & Nellie · 151896630 CFR 77.1104 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.