← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5028001
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.503 · $226.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5028000
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $267.00 proposed penalty

  3. Inspection of fire suppression devices.

    violationRecord 5027999
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  4. Inspection of fire suppression devices.

    violationRecord 5027998
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5027997
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $267.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5027996
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5029854
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  8. Loading and haulage equipment; installations.

    violationRecord 5028404
    Workman Branch Surface Mine · 4609664

    30 CFR 77.1605(k) · $151.00 proposed penalty

  9. Highwalls, pits and spoil banks; plans.

    violationRecord 5028402
    Workman Branch Surface Mine · 4609664

    30 CFR 77.1000 · $151.00 proposed penalty

  10. Spot Inspections

    inspectionRecord F007055
    Speed Mine · 4605437

    103(i) · 6.5 on-site hours reported

  11. Automatic emergency-parking brakes.

    violationRecord 5082101
    NO. 77 · 1509636

    30 CFR 75.523-3(c)(2) · $165.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5082100
    NO. 77 · 1509636

    30 CFR 75.503 · $226.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5081621
    Calvary No 81 · 1512753

    30 CFR 75.202(a) · $151.00 proposed penalty

  14. Roof bolting.

    violationRecord 5081620
    Calvary No 81 · 1512753

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  15. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5084638
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1714-3(b) · $313.00 proposed penalty

  16. Ventilation controls.

    violationRecord 5084637
    BEAR BRANCH 2 · 1518565

    30 CFR 75.333(d)(3) · $366.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5084464
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $883.00 proposed penalty

  18. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5084463
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1714-3(d) · $313.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5084462
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $883.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5084461
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $883.00 proposed penalty

  21. Refuge alternatives.

    violationRecord 5084460
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1506(g) · $313.00 proposed penalty

  22. Automatic fire warning devices; actions and response.

    violationRecord 5080036
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1103-5(a)(2) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5186325
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $1,679.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5186324
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  25. Other safeguards.

    violationRecord 5186323
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $1,431.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.