Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(a) · $398.00 proposed penalty
Ventilation controls.
Flying Eagle · 460947130 CFR 75.333(h) · $151.00 proposed penalty
Ventilation controls.
Flying Eagle · 460947130 CFR 75.333(c)(2) · $245.00 proposed penalty
Machinery and equipment; operation and maintenance.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.404(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Mechanical equipment guards.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.400(d) · $151.00 proposed penalty
Surface installations; general.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.200 · $177.00 proposed penalty
Mechanical equipment guards.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.400(d) · $151.00 proposed penalty
Travelways at surface installations.
Maple Eagle Preparation Plant · 460514530 CFR 77.205(a) · $151.00 proposed penalty
Travelways at surface installations.
Maple Eagle Preparation Plant · 460514530 CFR 77.205(b)
Loading and haulage equipment; inspection and maintenance.
Maple Eagle Preparation Plant · 460514530 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Maple Eagle Preparation Plant · 460514530 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Maple Eagle Preparation Plant · 460514530 CFR 77.1606(c) · $151.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Spot Inspection
Maple Eagle East Deep Mine · 46094167.0 on-site hours reported
Verbal Hazard Complaint Inspections
EAGLE #3 MINE · 46094276.0 on-site hours reported
Verbal Hazard Complaint Inspections
Flying Eagle · 46094715.0 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Kentucky River Loading · 151349530 CFR 77.1606(c) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
Kentucky River Loading · 151349530 CFR 77.410(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Kentucky River Loading · 151349530 CFR 77.1605(d) · $151.00 proposed penalty
Travelways at surface installations.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.205(e) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Maple Eagle Preparation Plant · 460514530 CFR 77.1110 · $151.00 proposed penalty
Travelways at surface installations.
Maple Eagle Preparation Plant · 460514530 CFR 77.205(a) · $151.00 proposed penalty
First aid equipment; location; minimum requirements.
Maple Eagle Preparation Plant · 460514530 CFR 77.1707(a) · $177.00 proposed penalty
Surface installations; general.
Maple Eagle Preparation Plant · 460514530 CFR 77.200 · $151.00 proposed penalty
Travelways at surface installations.
Maple Eagle Preparation Plant · 460514530 CFR 77.205(b) · $168.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.