← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 5130864
    Flying Eagle · 4609471

    30 CFR 75.512 · $336.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5130863
    Flying Eagle · 4609471

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F010AC1
    NO. 77 · 1509636

    103(i) · 6.5 on-site hours reported

  4. Spot Inspections

    inspectionRecord F039BBC
    Speed Mine · 4605437

    103(i) · 7.5 on-site hours reported

  5. Regular Safety and Health Inspection

    inspectionRecord F022D7A
    Coal Clean Prep Plant · 4608571

    77.5 on-site hours reported

  6. Spot Inspections

    inspectionRecord F00C0BC
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 5.0 on-site hours reported

  7. Regular Safety and Health Inspection

    inspectionRecord F011A53
    Glancy Surface Mine · 4609377

    196.3 on-site hours reported

  8. Regular Safety and Health Inspection

    inspectionRecord 6322599
    EAGLE #3 MINE · 4609427

    161.5 on-site hours reported

  9. Dry powder chemical systems; sensing and fire-suppression devices.

    violationRecord 5084314
    NO. 77 · 1509636

    30 CFR 75.1101-16(c) · $209.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5084479
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $883.00 proposed penalty

  11. On-shift examination.

    violationRecord 5084478
    BEAR BRANCH 2 · 1518565

    30 CFR 75.362(b) · $313.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084477
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1731(b) · $336.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5084476
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $883.00 proposed penalty

  14. Storage of materials.

    violationRecord 5028341
    South Hollow Prep Plant and Loadout · 4603085

    30 CFR 77.208(d) · $151.00 proposed penalty

  15. Machinery and equipment; operation and maintenance.

    violationRecord 5028340
    South Hollow Prep Plant and Loadout · 4603085

    30 CFR 77.404(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5097428
    Speed Mine · 4605437

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  17. Escapeway maps.

    violationRecord 5097427
    Speed Mine · 4605437

    30 CFR 75.1505(b) · $818.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5097426
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $2,503.00 proposed penalty

  19. Violation — cited standard not reported

    violationRecord 5021830
    Speed Mine · 4605437

    $4,871.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5020463
    Speed Mine · 4605437

    30 CFR 75.400 · Significant and substantial (S&S) · $8,315.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5020462
    Speed Mine · 4605437

    30 CFR 75.202(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5020461
    Speed Mine · 4605437

    30 CFR 75.202(a) · $883.00 proposed penalty

  23. Inspection of water sprinkler systems.

    violationRecord 5028119
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1101-11 · $151.00 proposed penalty

  24. Frequency of examinations.

    violationRecord 5028118
    NORTH EAGLE MINE · 4608759

    30 CFR 75.512-2 · $151.00 proposed penalty

  25. Other safeguards.

    violationRecord 5021247
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1403 · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.