← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5186371
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5186370
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5186369
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5183751
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  5. Drill dust control at underground areas of underground mines.

    violationRecord 5183750
    Maple Eagle East Deep Mine · 4609416

    30 CFR 72.630(b) · $151.00 proposed penalty

  6. Permissible electric face equipment; maintenance.

    violationRecord 5183749
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.503 · $151.00 proposed penalty

  7. Electric equipment and circuits; overload and short circuit protection.

    violationRecord 5180051
    EAGLE #3 MINE · 4609427

    30 CFR 75.518 · $245.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5180050
    EAGLE #3 MINE · 4609427

    30 CFR 75.503 · $245.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5180049
    EAGLE #3 MINE · 4609427

    30 CFR 75.400 · $151.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5180048
    EAGLE #3 MINE · 4609427

    30 CFR 75.503 · $267.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5130871
    Flying Eagle · 4609471

    30 CFR 75.400 · $432.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5130870
    Flying Eagle · 4609471

    30 CFR 75.400 · $432.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5130869
    Flying Eagle · 4609471

    30 CFR 75.400 · $432.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5130868
    Flying Eagle · 4609471

    30 CFR 75.1731(b) · $151.00 proposed penalty

  15. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 5130867
    Flying Eagle · 4609471

    30 CFR 75.1103-4(a)(1)(i) · $209.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F0142D3
    BEAR BRANCH 2 · 1518565

    103(i) · 5.5 on-site hours reported

  17. Machinery

    accidentRecord 220262110024
    Samples Mine Highwall Miner · 4609153

    Days away from work only

    Accident narrative

    Employee was sitting on a bucket using a torch to cut links out of a chain on the surface high wall miner. Employee stated they felt their foot get hot. Employee stated they had a small red spot on left foot big toe at the joint. Employee went to seek medical treatment 2 days after the incident.

  18. Handling of materials

    accidentRecord 220262040028
    Glancy Surface Mine · 4609377

    No dys awy frm wrk,no rstr act

    Accident narrative

    The EE stated they had the right-side rear door opened on lube truck checking the heater. Working with my right hand and balancing myself with my left when, the door unexpectedly swung all the way open striking the tip of my middle finger on my left hand against the left-side door hinge. EE went to the hospital 2 days later and had finger lanced to relieve pressure.

  19. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 6321647
    South Hollow Prep Plant and Loadout · 4603085

    3.3 on-site hours reported

  20. Main mine fan examinations and records.

    violationRecord 5081931
    Calvary No 81 · 1512753

    30 CFR 75.312(f)(1) · $151.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5082319
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $883.00 proposed penalty

  22. Escapeways; bituminous and lignite mines.

    violationRecord 5082318
    BEAR BRANCH 2 · 1518565

    30 CFR 75.380(d)(1) · Significant and substantial (S&S)

  23. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5082317
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1600-2(e) · $226.00 proposed penalty

  24. Mechanical equipment guards.

    violationRecord 5090063
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty

  25. Sanitary toilet facilities; maintenance.

    violationRecord 5024178
    Glancy Surface Mine · 4609377

    30 CFR 71.501 · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.