← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Handling of materials

    accidentRecord 220262260004
    Maple Eagle No. 1 Mine · 4604236

    Days away from work only

    Accident narrative

    EE was struck in the back by a falling timber, then fell forward into a scoop bucket. EE's face struck the scoop bucket. EE is off work awaiting an appointment with a specialist for a fracture in EE's lumbar spine.

  2. Accumulation of combustible materials.

    violationRecord 5084665
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $883.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 5084484
    BEAR BRANCH 2 · 1518565

    30 CFR 75.380(d)(7)(v) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5027661
    Speed Mine · 4605437

    30 CFR 75.400 · $504.00 proposed penalty

  5. First-aid equipment; location; minimum requirements.

    violationRecord 5027660
    Speed Mine · 4605437

    30 CFR 75.1713-7(c) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5027659
    Speed Mine · 4605437

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  7. Escapeways; bituminous and lignite mines.

    violationRecord 5027658
    Speed Mine · 4605437

    30 CFR 75.380(d)(7)(vii) · $592.00 proposed penalty

  8. Electric equipment; examination, testing and maintenance.

    violationRecord 5021849
    Speed Mine · 4605437

    30 CFR 75.512 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  9. Roof control plan.

    violationRecord 5020480
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · $883.00 proposed penalty

  10. Roof bolting.

    violationRecord 5020479
    Speed Mine · 4605437

    30 CFR 75.204(c)(1) · $465.00 proposed penalty

  11. Other safeguards.

    violationRecord 5021252
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1403 · $165.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5028060
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  13. Ventilation controls.

    violationRecord 5028059
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.333(b)(3) · $209.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5028058
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  15. Emergency tethers.

    violationRecord 5186377
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1714-6 · $432.00 proposed penalty

  16. Machinery and equipment; operation and maintenance.

    violationRecord 5028425
    Glancy Surface Mine · 4609377

    30 CFR 77.404(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  17. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5028424
    Glancy Surface Mine · 4609377

    30 CFR 77.1606(c) · $165.00 proposed penalty

  18. Loading and haulage equipment; installations.

    violationRecord 5028423
    Glancy Surface Mine · 4609377

    30 CFR 77.1605(k) · $165.00 proposed penalty

  19. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5024184
    Glancy Surface Mine · 4609377

    30 CFR 77.1606(c) · $245.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F00C0BD
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 10.0 on-site hours reported

  21. Automatic fire warning devices; actions and response.

    violationRecord 5081638
    Calvary No 81 · 1512753

    30 CFR 75.1103-5(h) · $151.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5084664
    BEAR BRANCH 2 · 1518565

    30 CFR 75.503 · $592.00 proposed penalty

  23. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5084663
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1106-3(a)(2) · $336.00 proposed penalty

  24. Permissible electric face equipment; maintenance.

    violationRecord 5021848
    Speed Mine · 4605437

    30 CFR 75.503 · $2,712.00 proposed penalty

  25. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 5021847
    Speed Mine · 4605437

    30 CFR 75.1107-7(b) · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.