Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Verbal Hazard Complaint Inspections
East Mac & Nellie · 15189667.8 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 5.0 on-site hours reported
Other safeguards.
Calvary No 81 · 151275330 CFR 75.1403
Loading and haulage equipment; inspection and maintenance.
BEAR BRANCH 2 · 151856530 CFR 77.1606(c) · $151.00 proposed penalty
Accumulations of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 77.1104 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
BEAR BRANCH 2 · 151856530 CFR 77.1606(c) · $465.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
BEAR BRANCH 2 · 151856530 CFR 77.1606(c) · $151.00 proposed penalty
Rock dusting.
Speed Mine · 460543730 CFR 75.402 · $432.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Mechanical equipment guards.
NORTH EAGLE MINE · 460875930 CFR 75.1722(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Mine ventilation plan; submission and approval.
NORTH EAGLE MINE · 460875930 CFR 75.370(a)(1) · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NORTH EAGLE MINE · 460875930 CFR 75.1731(a) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NORTH EAGLE MINE · 460875930 CFR 75.1731(a) · $165.00 proposed penalty
Loading and haulage equipment; installations.
Glancy Surface Mine · 460937730 CFR 77.1605(d) · $165.00 proposed penalty
Accumulation of combustible materials.
EAGLE #3 MINE · 460942730 CFR 75.400 · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
EAGLE #3 MINE · 460942730 CFR 75.1731(a) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
EAGLE #3 MINE · 460942730 CFR 75.1100-2(b) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(b) · $245.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $549.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Calvary No 81 · 151275330 CFR 75.512 · $151.00 proposed penalty
Mechanical equipment guards.
Calvary No 81 · 151275330 CFR 77.400(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.