Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Accumulation of combustible materials.
NORTH EAGLE MINE · 460875930 CFR 75.400 · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle East Deep Mine · 460941630 CFR 75.370(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle East Deep Mine · 460941630 CFR 75.370(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle East Deep Mine · 460941630 CFR 75.370(a)(1) · $151.00 proposed penalty
Protection of trailing cables.
Maple Eagle East Deep Mine · 460941630 CFR 75.606 · $151.00 proposed penalty
Other safeguards.
EAGLE #3 MINE · 460942730 CFR 75.1403 · $165.00 proposed penalty
Condition and examination of firefighting equipment.
EAGLE #3 MINE · 460942730 CFR 75.1100-3 · $818.00 proposed penalty
Fall of roof or back
NO. 77 · 1509636Accident only
Accident narrative
A roof fall approximately 60' long x 20' wide, up to 18' thick occurred at cross cut 4 on the 2nd Primary Mains.
Non-Injury Accident Investigation
NO. 77 · 150963611.0 on-site hours reported
Protection from falls of roof, face and ribs.
NO. 77 · 150963630 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Violation — cited standard not reported
NO. 77 · 1509636Roof control plan.
EAGLE #3 MINE · 460942730 CFR 75.220(a)(1) · $165.00 proposed penalty
Other safeguards.
EAGLE #3 MINE · 460942730 CFR 75.1403 · $165.00 proposed penalty
Non-Injury Accident Investigation
Calvary No 81 · 151275312.0 on-site hours reported
Protection from falls of roof, face and ribs.
Calvary No 81 · 151275330 CFR 75.202(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Violation — cited standard not reported
Calvary No 81 · 1512753Fall of roof or back
Calvary No 81 · 1512753Accident only
Accident narrative
A non-injury roof fall occurred on the Pigeonroost Mains in by x-cut 43. The fall was approximately 16' x 20' x 3'. This was a result of deterioration in a transition zone from sandstone to shale.
Impoundment Spot Inspection
Rocklick Preparation Plant · 46064485.0 on-site hours reported
Verbal Hazard Complaint Inspections
Blue Creek No. 1 UG Mine · 460929715.0 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
East Mac & Nellie · 151896630 CFR 77.1606(c) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · $697.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
Speed Mine · 460543730 CFR 75.1101-10 · $398.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $959.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Winchester Peerless Rachel Mine · 460925830 CFR 75.601-1 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.