Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Identification check system.
Calvary No 81 · 151275330 CFR 75.1715 · $151.00 proposed penalty
Roof control plan.
Calvary No 81 · 151275330 CFR 75.220(a)(1) · $151.00 proposed penalty
Preshift examination at fixed intervals.
BEAR BRANCH 2 · 151856530 CFR 75.360(b)(11)(i) · $177.00 proposed penalty
Mechanical equipment guards.
BEAR BRANCH 2 · 151856530 CFR 75.1722(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
BEAR BRANCH 2 · 151856530 CFR 75.1600-2(e) · $177.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
BEAR BRANCH 2 · 151856530 CFR 75.1106-3(a)(2) · $177.00 proposed penalty
Roof control plan.
BEAR BRANCH 2 · 151856530 CFR 75.220(a)(1) · $209.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $366.00 proposed penalty
First-aid equipment; location; minimum requirements.
Speed Mine · 460543730 CFR 75.1713-7(b)(7) · $151.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
Speed Mine · 460543730 CFR 75.1600-2(e) · $398.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Speed Mine · 460543730 CFR 75.512 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Speed Mine · 460543730 CFR 75.512 · $151.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
Speed Mine · 460543730 CFR 75.503 · $151.00 proposed penalty
Other safeguards.
Speed Mine · 460543730 CFR 75.1403
Escapeway maps.
Speed Mine · 460543730 CFR 75.1505(b) · $3,184.00 proposed penalty
Proximity detection systems.
Speed Mine · 460543730 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Protection from falls of roof, face and ribs.
Speed Mine · 460543730 CFR 75.202(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(b) · $9,004.00 proposed penalty
Accumulations of combustible materials.
Rocklick Preparation Plant · 460644830 CFR 77.1104 · $398.00 proposed penalty
Dust accumulations in surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.202 · $10,569.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(d) · $1,968.00 proposed penalty
Machinery and equipment; operation and maintenance.
NORTH EAGLE MINE · 460875930 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.