← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-11-07Database snapshot · 2026-11-07

Safety activity

  1. Travelways at surface installations.

    violationRecord 5025223
    Rocklick Preparation Plant · 4606448

    30 CFR 77.205(d) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  2. Roof control plan.

    violationRecord 9848984
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  3. Loading and haulage equipment; operation.

    violationRecord 9845007
    Glancy Surface Mine · 4609377

    30 CFR 77.1607(i) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  4. Loading and haulage equipment; operation.

    violationRecord 9845006
    Glancy Surface Mine · 4609377

    30 CFR 77.1607(i) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  5. Mobile equipment; automatic warning devices.

    violationRecord 5024753
    EAGLE #3 MINE · 4609427

    30 CFR 77.410(b) · $151.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 5024752
    EAGLE #3 MINE · 4609427

    30 CFR 77.1605(b) · $398.00 proposed penalty

  7. Accumulations of combustible materials.

    violationRecord 5024751
    EAGLE #3 MINE · 4609427

    30 CFR 77.1104 · $1,320.00 proposed penalty

  8. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5024750
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $1,320.00 proposed penalty

  9. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5024749
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $398.00 proposed penalty

  10. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5024925
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.1714-3(d) · $151.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F000354
    NO. 77 · 1509636

    103(i) · 5.8 on-site hours reported

  12. Deenergized underground power circuits; idle days—idle shifts.

    violationRecord 9778641
    NO. 77 · 1509636

    30 CFR 75.706 · $151.00 proposed penalty

  13. Methane monitors.

    violationRecord 9774881
    NO. 77 · 1509636

    30 CFR 75.342(a)(4) · $504.00 proposed penalty

  14. Ventilation controls.

    violationRecord 9778640
    NO. 77 · 1509636

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  15. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9777239
    NO. 77 · 1509636

    30 CFR 75.1911(d) · $151.00 proposed penalty

  16. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9777238
    NO. 77 · 1509636

    30 CFR 75.1910(j) · $151.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 9837742
    Flying Eagle · 4609471

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F000353
    BEAR BRANCH 2 · 1518565

    103(i) · 4.5 on-site hours reported

  19. Spot Inspections

    inspectionRecord F00FEEE
    Speed Mine · 4605437

    103(i) · 6.0 on-site hours reported

  20. Spot Inspection

    inspectionRecord F009F3F
    Flying Eagle · 4609471

    14.8 on-site hours reported

  21. Maintenance of incombustible content of rock dust.

    violationRecord 5023952
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.403 · $336.00 proposed penalty

  22. Maintenance of incombustible content of rock dust.

    violationRecord 5023951
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.403 · $336.00 proposed penalty

  23. Maintenance of incombustible content of rock dust.

    violationRecord 5023950
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.403 · $336.00 proposed penalty

  24. Maintenance of incombustible content of rock dust.

    violationRecord 5023949
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.403 · $336.00 proposed penalty

  25. Permissible exposure level.

    violationRecord 9849109
    Speed Mine · 4605437

    30 CFR 62.130(b) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.