Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $245.00 proposed penalty
Machinery and equipment; operation and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1725(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Quantity and location of firefighting equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1100-2(f) · $151.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
COAL BRANCH NO. 2 · 460966330 CFR 75.1600-2(b) · $151.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
COAL BRANCH NO. 2 · 460966330 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Handtools (nonpowered)
Speed Mine · 4605437No dys awy frm wrk,no rstr act
Accident narrative
Employee was injured when EE struck self in the face with a ratchet while tightening the gear case mounting bolts on a continuous miner causing a laceration above EE's left eye resulting in 18 sutures.
Handtools (nonpowered)
Blue Creek No. 1 UG Mine · 4609297No dys awy frm wrk,no rstr act
Accident narrative
Employee was trying to recover aqua couplings. Employee was using a crib to remove coupling from waterline and smashed finger between waterline and coupling.
Fall of roof or back
Flying Eagle · 4609471No dys awy frm wrk,no rstr act
Accident narrative
Employee stated EE was installing roof bolts in the #2 entry when a piece of draw rock fell, striking EE on the right side of EE's head. This caused a laceration to EE's right cheek that required sutures. Employee returned to work on EE's next shift with a full duty release.
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 5.3 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $226.00 proposed penalty
Methane monitors.
BEAR BRANCH 2 · 151856530 CFR 75.342(a)(4) · $151.00 proposed penalty
Weekly examination.
BEAR BRANCH 2 · 151856530 CFR 75.364(g) · $226.00 proposed penalty
Power wires and cables; insulation and protection.
Maple Eagle No. 1 Mine · 460423630 CFR 75.517 · $642.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $151.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $267.00 proposed penalty
Electric equipment; examination, testing and maintenance.
NORTH EAGLE MINE · 460875930 CFR 75.512 · $398.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
EAGLE #3 MINE · 460942730 CFR 75.1731(a) · $3,448.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection.
EAGLE #3 MINE · 460942730 CFR 75.518 · $592.00 proposed penalty
Permissible electric face equipment; maintenance.
EAGLE #3 MINE · 460942730 CFR 75.503 · $1,968.00 proposed penalty
Power wires and cables; insulation and protection.
EAGLE #3 MINE · 460942730 CFR 75.517 · Significant and substantial (S&S) · $13,436.00 proposed penalty
Fall of roof or back
Winchester Peerless Rachel Mine · 4609258Accident only
Accident narrative
An unintentional roof fall was discovered at the Winchester Peerless Rachel Mine, 2nd Left Panel at #4 Brk, between #6 and #7 Entry, spad #'s 12654 and 12655. The area has been dangered off. MSHA and State Officials have been notified. No injuries or entrapments. No ventilation disruption and no travel ways have been blocked. The fall is approx. 5-6 ft. thick and 18 ft. wide.
Mine emergency evacuation training and drills.
Calvary No 81 · 151275330 CFR 75.1504(a) · $151.00 proposed penalty
Communication wires and cables; installation; insulation; support.
Calvary No 81 · 151275330 CFR 75.516-2(b) · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.