← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-11-07Database snapshot · 2026-11-07

Safety activity

  1. Ventilation controls.

    violationRecord 9847383
    NORTH EAGLE MINE · 4608759

    30 CFR 75.333(c)(2) · $209.00 proposed penalty

  2. Other safeguards.

    violationRecord 9843200
    Coalburg Tunnel Mine · 4608993

    30 CFR 75.1403 · Significant and substantial (S&S) · $697.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9848505
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $193.00 proposed penalty

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9848504
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1731(b) · $226.00 proposed penalty

  5. Multi-gas detectors.

    violationRecord 9848503
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1714-7(c) · $1,818.00 proposed penalty

  6. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 9848502
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1107-7(b) · $151.00 proposed penalty

  7. Emergency tethers.

    violationRecord 9849610
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1714-6 · $151.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 9848997
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.503 · $465.00 proposed penalty

  9. Machinery and equipment; operation and maintenance.

    violationRecord 9848996
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 9848995
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.503 · $465.00 proposed penalty

  11. Roof control plan.

    violationRecord 9848994
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  12. Preshift examination at fixed intervals.

    violationRecord 9848993
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.360(g) · $151.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F00FEEF
    Speed Mine · 4605437

    103(i) · 5.0 on-site hours reported

  14. Electrical Technical Investigation

    inspectionRecord F00EB16
    Flying Eagle · 4609471

    6.5 on-site hours reported

  15. Electric equipment; examination, testing and maintenance.

    violationRecord 9777518
    BEAR BRANCH 2 · 1518565

    30 CFR 75.512 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  16. Loading and haulage equipment; installations.

    violationRecord 5025322
    Rocklick Preparation Plant · 4606448

    30 CFR 77.1605(d) · $398.00 proposed penalty

  17. Escapeways; bituminous and lignite mines.

    violationRecord 9844809
    Flying Eagle · 4609471

    30 CFR 75.380(d)(4) · $366.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 9841403
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $209.00 proposed penalty

  19. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5023550
    Speed Mine · 4605437

    30 CFR 75.1731(a) · $151.00 proposed penalty

  20. Mechanical equipment guards.

    violationRecord 5025228
    Rocklick Preparation Plant · 4606448

    30 CFR 77.400(d) · $1,431.00 proposed penalty

  21. Loading and haulage equipment; operation.

    violationRecord 5025227
    Rocklick Preparation Plant · 4606448

    30 CFR 77.1607(cc) · $592.00 proposed penalty

  22. Mechanical equipment guards.

    violationRecord 5025226
    Rocklick Preparation Plant · 4606448

    30 CFR 77.400(d) · $1,431.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 9848992
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  24. Permissible electric face equipment; maintenance.

    violationRecord 9848991
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.503 · $592.00 proposed penalty

  25. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 9848990
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1107-7(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.