Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Winchester 2 · 460961530 CFR 75.400
Verbal Hazard Complaint Inspections
Speed Mine · 46054370.0 on-site hours reported
Roof control plan.
NO. 77 · 150963630 CFR 75.220(a)(1)
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400
Sanitary toilet facilities; maintenance.
No. 76 Plant · 151652030 CFR 71.501
Ventilation controls.
BEAR BRANCH 2 · 151856530 CFR 75.333(d)(3)
Clamping of trailing cables to equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 75.605
Rock dusting.
Winchester Peerless Rachel Mine · 460925830 CFR 75.402
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 4.0 on-site hours reported
Short circuit protection; ratings and settings of circuit breakers.
NORTH EAGLE MINE · 460875930 CFR 75.601-1
Short circuit protection; ratings and settings of circuit breakers.
NORTH EAGLE MINE · 460875930 CFR 75.601-1
Regular Safety and Health Inspection
No. 76 Plant · 151652014.0 on-site hours reported
Accumulation of combustible materials.
Maple Eagle East Deep Mine · 460941630 CFR 75.400
Verbal Hazard Complaint Inspections
BEAR BRANCH 2 · 15185656.3 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 3.0 on-site hours reported
Preshift examination at fixed intervals.
NO. 77 · 150963630 CFR 75.360(b)(11)(i) · Significant and substantial (S&S)
Ventilation controls.
NO. 77 · 150963630 CFR 75.333(b)(4)
Mining methods.
NO. 77 · 150963630 CFR 75.203(e)(2) · Significant and substantial (S&S)
Mine ventilation plan; submission and approval.
BEAR BRANCH 2 · 151856530 CFR 75.370(a)(1)
On-shift examination.
BEAR BRANCH 2 · 151856530 CFR 75.362(g)(2)(i)
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400
Ventilation controls.
BEAR BRANCH 2 · 151856530 CFR 75.333(d)(2)
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.