Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 6.0 on-site hours reported
Roof control plan.
NO. 77 · 150963630 CFR 75.220(a)(1) · Significant and substantial (S&S) · $697.00 proposed penalty
Identification check system.
NO. 77 · 150963630 CFR 75.1715 · $151.00 proposed penalty
Automatic fire warning devices; actions and response.
Calvary No 81 · 151275330 CFR 75.1103-5(a)(1) · $151.00 proposed penalty
Ventilation controls.
Calvary No 81 · 151275330 CFR 75.333(b)(3) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
Calvary No 81 · 151275330 CFR 75.1100-2(b) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
BEAR BRANCH 2 · 151856530 CFR 72.630(b) · $1,818.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Criteria—Belt conveyors.
BEAR BRANCH 2 · 151856530 CFR 75.1403-5(g) · $226.00 proposed penalty
Ventilation controls.
BEAR BRANCH 2 · 151856530 CFR 75.333(d)(3) · $226.00 proposed penalty
Examination and maintenance of firefighting equipment.
Samples Surface Mine · 460717830 CFR 77.1110 · $465.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(d) · $592.00 proposed penalty
Openings in surface installations; safeguards.
Samples Surface Mine · 460717830 CFR 77.204 · $267.00 proposed penalty
Fall of roof or back
EAGLE #3 MINE · 4609427Accident only
Accident narrative
An unplanned roof fall occurred at this mine and was found by the owl shift on their way outside to the surface. The fall occurred on #1 Belt at 25 break and extended toward the intake stopping line at SS#: 1390. There were no injuries due to this accident.
Non-Injury Accident Investigation
EAGLE #3 MINE · 460942710.0 on-site hours reported
Violation — cited standard not reported
EAGLE #3 MINE · 4609427Regular Safety and Health Inspection
South Hollow Prep Plant and Loadout · 460308569.8 on-site hours reported
Regular Safety and Health Inspection
Coalburg Tunnel Mine · 4608993106.0 on-site hours reported
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $209.00 proposed penalty
Handling of materials
Glancy Surface Mine · 4609377No dys awy frm wrk,no rstr act
Accident narrative
Mechanic was attempting to install a pin into the retaining cable for a Cat 785 rock truck when the cable slipped causing an incision in mechanic's right hand
Regular Safety and Health Inspection
WELLS PREP PLANT AND LOADOUT · 460529551.0 on-site hours reported
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 6.0 on-site hours reported
Disconnecting devices.
NO. 77 · 150963630 CFR 75.903 · $151.00 proposed penalty
Escapeway maps.
NO. 77 · 150963630 CFR 75.1505(b) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
Calvary No 81 · 151275330 CFR 75.1100-2(e) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.