Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $226.00 proposed penalty
Roof control plan.
NO. 77 · 150963630 CFR 75.220(a)(1) · Significant and substantial (S&S) · $697.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
NO. 77 · 150963630 CFR 75.1714-3(b) · $151.00 proposed penalty
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
Calvary No 81 · 151275330 CFR 75.202(a) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
BEAR BRANCH 2 · 151856530 CFR 75.370(a)(1) · $336.00 proposed penalty
Ventilation controls.
BEAR BRANCH 2 · 151856530 CFR 75.333(c)(3) · $226.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $288.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
WELLS PREP PLANT AND LOADOUT · 460529530 CFR 77.1606(c) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Rocklick Preparation Plant · 460644830 CFR 77.502 · $398.00 proposed penalty
Dust accumulations in surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.202
Condition and examination of firefighting equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1100-3 · $151.00 proposed penalty
Roof control plan.
Winchester Peerless Rachel Mine · 460925830 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Automatic emergency-parking brakes.
Winchester Peerless Rachel Mine · 460925830 CFR 75.523-3(c)(2) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
Winchester Peerless Rachel Mine · 460925830 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Maintenance of incombustible content of rock dust.
EAGLE #3 MINE · 460942730 CFR 75.403 · $592.00 proposed penalty
Machinery
EAGLE #3 MINE · 4609427Days away from work only
Accident narrative
Witness to the accident stated that when shutting the miner off to hook up a rope on the miner, the witness heard the injured employee call out for help. The injured employee was caught between the boom of the miner and the coal rib where the employee sustained a fractured L1 vertebra.
Non-Injury Accident Investigation
Calvary No 81 · 151275322.5 on-site hours reported
Non-Fatal Accident Investigation
EAGLE #3 MINE · 460942721.0 on-site hours reported
Violation — cited standard not reported
Calvary No 81 · 1512753Weekly examination.
BEAR BRANCH 2 · 151856530 CFR 75.364(b)(2) · $226.00 proposed penalty
Sampling; general and technical requirements.
Coal Clean Prep Plant · 460857130 CFR 71.201(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1725(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.