Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Winchester 2 · 460961530 CFR 75.400 · $165.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Regular Safety and Health Inspection
Coon Hollow Tunnel Mine · 460909915.3 on-site hours reported
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
BEAR BRANCH 2 · 151856530 CFR 75.370(a)(1) · $549.00 proposed penalty
Mechanical equipment guards.
BEAR BRANCH 2 · 151856530 CFR 75.1722(c) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.512 · $336.00 proposed penalty
Machinery and equipment; operation and maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.1725(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Weekly examination.
Maple Eagle No. 1 Mine · 460423630 CFR 75.364(a)(1) · $755.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(h) · $165.00 proposed penalty
Quantity and location of firefighting equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1100-2(f) · $151.00 proposed penalty
Fire suppression devices; approved components; installation requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1107-3(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Speed Mine · 460543730 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $432.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(d) · $592.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(d) · $592.00 proposed penalty
Mobile equipment; automatic warning devices.
Samples Surface Mine · 460717830 CFR 77.410(c) · $267.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester Peerless Rachel Mine · 460925830 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Verbal Hazard Complaint Inspections
EAGLE #3 MINE · 46094279.8 on-site hours reported
Mine ventilation plan; submission and approval.
EAGLE #3 MINE · 460942730 CFR 75.370(a)(1) · $2,936.00 proposed penalty
Violation — cited standard not reported
Coal Branch No.1 Mine · 4609588$909.00 proposed penalty
Spot Inspections
NO. 77 · 1509636103(i) · 3.5 on-site hours reported
Daily examination of hoisting equipment.
NO. 77 · 150963630 CFR 75.1400-3(b)(5) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.503 · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.