← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspection

    inspectionRecord 6322941
    Samples Mine Highwall Miner · 4609153

    1.5 on-site hours reported

  2. Spot Inspections

    inspectionRecord 6322543
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 6.0 on-site hours reported

  3. Spot Inspection

    inspectionRecord F020A3B
    Flying Eagle · 4609471

    6.0 on-site hours reported

  4. Machinery and equipment; operation and maintenance.

    violationRecord 5025326
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.404(a) · Significant and substantial (S&S) · $398.00 proposed penalty

  5. Accumulations of combustible materials.

    violationRecord 5025325
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.1104 · $151.00 proposed penalty

  6. Accumulations of combustible materials.

    violationRecord 5025324
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.1104 · $151.00 proposed penalty

  7. Travelways at surface installations.

    violationRecord 5025323
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.205(b) · Significant and substantial (S&S) · $398.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9848507
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $177.00 proposed penalty

  9. Clamping of trailing cables to equipment.

    violationRecord 9848506
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.605 · $209.00 proposed penalty

  10. Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.

    violationRecord 9839730
    Flying Eagle · 4609471

    30 CFR 50.20(a) · $151.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 9839729
    Flying Eagle · 4609471

    30 CFR 75.202(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F000356
    BEAR BRANCH 2 · 1518565

    103(i) · 5.5 on-site hours reported

  13. Roof control plan.

    violationRecord 5024928
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty

  14. Spot Inspections

    inspectionRecord F00FEF0
    Speed Mine · 4605437

    103(i) · 4.0 on-site hours reported

  15. Minimum requirements; fire suppression materials and location; maintenance of entries and crosscuts; access doors; communications; fire crews; high-expansion foam devices.

    violationRecord 8537107
    NO. 77 · 1509636

    30 CFR 75.1103-9(a)(1) · $151.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 9849001
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  17. Hoisting

    accidentRecord 220250700024
    NORTH EAGLE MINE · 4608759

    Accident only

    Accident narrative

    At approximately 9:00 a.m., the Winifrede Slope Hoist was found to be non-operational, displaying a drum fault condition for over 30 minutes. Electricians are currently troubleshooting on-site and conducting necessary repairs. No accidents or entrapments have resulted from this issue, and personnel can safely enter and exit the mine. This is not an emergency escapeway.

  18. Spot Inspection

    inspectionRecord F00063F
    Kentucky River Loading · 1513495

    5.0 on-site hours reported

  19. Spot Inspections

    inspectionRecord F008DED
    BEAR BRANCH 2 · 1518565

    103(i) · 9.5 on-site hours reported

  20. Spot Inspection

    inspectionRecord F009F41
    Flying Eagle · 4609471

    6.0 on-site hours reported

  21. Quantity and location of firefighting equipment.

    violationRecord 8537106
    NO. 77 · 1509636

    30 CFR 77.1109(a) · $504.00 proposed penalty

  22. Quantity and location of firefighting equipment.

    violationRecord 8537105
    NO. 77 · 1509636

    30 CFR 77.1109(a) · $151.00 proposed penalty

  23. Mine map.

    violationRecord 9831885
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1200(h) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9849111
    Speed Mine · 4605437

    30 CFR 75.1731(b) · Significant and substantial (S&S) · $592.00 proposed penalty

  25. Hand-held power tools; safety devices.

    violationRecord 9849612
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1724 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.