← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Belt air course ventilation.

    violationRecord 9777538
    NO. 77 · 1509636

    30 CFR 75.350(a)(2) · $151.00 proposed penalty

  2. Quantity and location of firefighting equipment.

    violationRecord 9777537
    NO. 77 · 1509636

    30 CFR 75.1100-2(b) · $151.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9777536
    NO. 77 · 1509636

    30 CFR 75.400 · $165.00 proposed penalty

  4. Roof control plan.

    violationRecord 9776337
    Calvary No 81 · 1512753

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $755.00 proposed penalty

  5. Ventilation controls.

    violationRecord 9776336
    Calvary No 81 · 1512753

    30 CFR 75.333(b)(3) · $151.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9776278
    Calvary No 81 · 1512753

    30 CFR 75.400 · $209.00 proposed penalty

  7. Requirement for container labels.

    violationRecord 9777314
    BEAR BRANCH 2 · 1518565

    30 CFR 47.41(a) · $226.00 proposed penalty

  8. Preshift examination at fixed intervals.

    violationRecord 9778717
    BEAR BRANCH 2 · 1518565

    30 CFR 75.360(g) · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9778716
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $465.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9778715
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1731(a) · $267.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 5025053
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5025052
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5025051
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5025050
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $697.00 proposed penalty

  15. Other safeguards.

    violationRecord 9848516
    Speed Mine · 4605437

    30 CFR 75.1403 · Significant and substantial (S&S) · $38,016.00 proposed penalty

  16. Examination and maintenance of firefighting equipment.

    violationRecord 9846718
    Samples Surface Mine · 4607178

    30 CFR 77.1110 · $465.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5024943
    NORTH EAGLE MINE · 4608759

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5025626
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  19. Other safeguards.

    violationRecord 5025625
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1403 · $151.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9841409
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.400 · $177.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 9841408
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.202(a) · $151.00 proposed penalty

  22. Rock dusting.

    violationRecord 5024266
    EAGLE #3 MINE · 4609427

    30 CFR 75.402 · $3,184.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5024265
    EAGLE #3 MINE · 4609427

    30 CFR 75.517 · Significant and substantial (S&S) · $13,436.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5024264
    EAGLE #3 MINE · 4609427

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  25. Preshift examination at fixed intervals.

    violationRecord 5091046
    Flying Eagle · 4609471

    30 CFR 75.360(b)(9) · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.