Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Belt air course ventilation.
NO. 77 · 150963630 CFR 75.350(a)(2) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
NO. 77 · 150963630 CFR 75.1100-2(b) · $151.00 proposed penalty
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $165.00 proposed penalty
Roof control plan.
Calvary No 81 · 151275330 CFR 75.220(a)(1) · Significant and substantial (S&S) · $755.00 proposed penalty
Ventilation controls.
Calvary No 81 · 151275330 CFR 75.333(b)(3) · $151.00 proposed penalty
Accumulation of combustible materials.
Calvary No 81 · 151275330 CFR 75.400 · $209.00 proposed penalty
Requirement for container labels.
BEAR BRANCH 2 · 151856530 CFR 47.41(a) · $226.00 proposed penalty
Preshift examination at fixed intervals.
BEAR BRANCH 2 · 151856530 CFR 75.360(g) · $151.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
BEAR BRANCH 2 · 151856530 CFR 75.1731(a) · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $288.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $697.00 proposed penalty
Other safeguards.
Speed Mine · 460543730 CFR 75.1403 · Significant and substantial (S&S) · $38,016.00 proposed penalty
Examination and maintenance of firefighting equipment.
Samples Surface Mine · 460717830 CFR 77.1110 · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
NORTH EAGLE MINE · 460875930 CFR 75.370(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Other safeguards.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1403 · $151.00 proposed penalty
Accumulation of combustible materials.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.400 · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.202(a) · $151.00 proposed penalty
Rock dusting.
EAGLE #3 MINE · 460942730 CFR 75.402 · $3,184.00 proposed penalty
Power wires and cables; insulation and protection.
EAGLE #3 MINE · 460942730 CFR 75.517 · Significant and substantial (S&S) · $13,436.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
EAGLE #3 MINE · 460942730 CFR 75.1731(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Preshift examination at fixed intervals.
Flying Eagle · 460947130 CFR 75.360(b)(9) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.