Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Machinery and equipment; operation and maintenance.
Sycamore Surface Mine · 460705830 CFR 77.404(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Examination and maintenance of firefighting equipment.
Sycamore Surface Mine · 460705830 CFR 77.1110 · $1,126.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Sycamore Surface Mine · 460705830 CFR 77.1606(c) · Significant and substantial (S&S) · $10,569.00 proposed penalty
Permissible electric face equipment; maintenance.
NORTH EAGLE MINE · 460875930 CFR 75.503 · $883.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
NORTH EAGLE MINE · 460875930 CFR 75.1107-7(b) · $209.00 proposed penalty
Maintenance of incombustible content of rock dust.
Winchester Peerless Rachel Mine · 460925830 CFR 75.403 · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Winchester Peerless Rachel Mine · 460925830 CFR 75.400 · $151.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1002(a) · $151.00 proposed penalty
Underground electrical installations.
Winchester 2 · 460961530 CFR 75.340(a)(1)(i) · $165.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester 2 · 460961530 CFR 75.380(d)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester 2 · 460961530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester 2 · 460961530 CFR 75.512 · $165.00 proposed penalty
Fall of roof or back
NO. 77 · 1509636Accident only
Accident narrative
a non injury roof fall had at cross cut 24 in entry 3 on the third primary mains.
Non-Injury Accident Investigation
NO. 77 · 150963610.0 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 6.0 on-site hours reported
Protection from falls of roof, face and ribs.
NO. 77 · 150963630 CFR 75.202(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Violation — cited standard not reported
NO. 77 · 1509636Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $209.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Calvary No 81 · 151275330 CFR 77.1606(c) · $209.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
East Mac & Nellie · 151896630 CFR 77.1606(c) · $366.00 proposed penalty
Machinery and equipment; operation and maintenance.
East Mac & Nellie · 151896630 CFR 77.404(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Examination and maintenance of firefighting equipment.
Samples Surface Mine · 460717830 CFR 77.1110 · $465.00 proposed penalty
Ventilation controls.
NORTH EAGLE MINE · 460875930 CFR 75.333(e)(1)(ii) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
NORTH EAGLE MINE · 460875930 CFR 75.370(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.