Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Cable fittings; suitability.
BEAR BRANCH 2 · 151856530 CFR 75.515 · $226.00 proposed penalty
Identification of circuit breakers.
BEAR BRANCH 2 · 151856530 CFR 75.904 · $226.00 proposed penalty
Cable fittings; suitability.
BEAR BRANCH 2 · 151856530 CFR 75.515 · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.512 · $336.00 proposed penalty
Cable fittings; suitability.
BEAR BRANCH 2 · 151856530 CFR 75.515 · $226.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Mechanical equipment guards.
BEAR BRANCH 2 · 151856530 CFR 75.1722(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
BEAR BRANCH 2 · 151856530 CFR 75.1731(a) · $267.00 proposed penalty
Accumulations of combustible materials.
East Mac & Nellie · 151896630 CFR 77.1104 · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $193.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $193.00 proposed penalty
Quantity and location of firefighting equipment.
WELLS PREP PLANT AND LOADOUT · 460529530 CFR 77.1109(c)(1) · $151.00 proposed penalty
Ground control; inspection and maintenance; general.
Samples Surface Mine · 460717830 CFR 77.1004(b) · $883.00 proposed penalty
Loading and haulage equipment; operation.
Samples Surface Mine · 460717830 CFR 77.1607(i) · $267.00 proposed penalty
Methane monitors.
Maple Eagle No. 1 Mine · 460423630 CFR 75.342(a)(4) · $165.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $465.00 proposed penalty
Impoundment Spot Inspection
Rocklick Preparation Plant · 46064482.5 on-site hours reported
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 6.5 on-site hours reported
Electric equipment; examination, testing and maintenance.
NO. 77 · 150963630 CFR 75.512 · $151.00 proposed penalty
Preshift examination at fixed intervals.
Maple Eagle No. 1 Mine · 460423630 CFR 75.360(g) · $151.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
NORTH EAGLE MINE · 460875930 CFR 50.20(a) · $151.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
NORTH EAGLE MINE · 460875930 CFR 50.20(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.