← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Fire suppression devices; approved components; installation requirements.

    violationRecord 5025654
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1107-3(d) · $151.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5025653
    NORTH EAGLE MINE · 4608759

    30 CFR 75.512 · $165.00 proposed penalty

  3. Machinery

    accidentRecord 220251680023
    NORTH EAGLE MINE · 4608759

    Accident only

    Accident narrative

    The electronic tracking system became inoperative at approximately 8:00 p.m. on 6/16/2025 from 9 North to the #2 Section in the Track and Intake Entries. Manual tracking procedures are in place, and troubleshooting efforts are underway to resolve the issue.

  4. Regular Safety and Health Inspection

    inspectionRecord 6323099
    Rocklick Preparation Plant · 4606448

    127.5 on-site hours reported

  5. Requirement for container labels.

    violationRecord 5025269
    Rocklick Preparation Plant · 4606448

    30 CFR 47.41(a) · $398.00 proposed penalty

  6. Travelways at surface installations.

    violationRecord 5025268
    Rocklick Preparation Plant · 4606448

    30 CFR 77.205(b) · $1,679.00 proposed penalty

  7. Travelways at surface installations.

    violationRecord 5025267
    Rocklick Preparation Plant · 4606448

    30 CFR 77.205(e) · $398.00 proposed penalty

  8. Temporary notations, revisions, and supplements.

    violationRecord 5024968
    Coalburg Tunnel Mine · 4608993

    30 CFR 75.1202 · $151.00 proposed penalty

  9. Ventilation controls.

    violationRecord 5024967
    Coalburg Tunnel Mine · 4608993

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5023558
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5024139
    Coal Branch No.1 Mine · 4609588

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  12. Electric equipment; examination, testing and maintenance.

    violationRecord 5024138
    Coal Branch No.1 Mine · 4609588

    30 CFR 75.512 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  13. Fall of roof or back

    accidentRecord 220251640030
    Winchester Peerless Rachel Mine · 4609258

    Days away from work only

    Accident narrative

    Employee was struck by a large section of top rock while kneeling beside a continuous miner during troubleshooting. The rock fell without warning, pinning EE's right leg and fracturing EE's fibula.

  14. Spot Inspections

    inspectionRecord F0006F2
    BEAR BRANCH 2 · 1518565

    103(i) · 6.5 on-site hours reported

  15. Spot Inspections

    inspectionRecord 6321599
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 6.5 on-site hours reported

  16. Methane monitors.

    violationRecord 9778781
    BEAR BRANCH 2 · 1518565

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 9778780
    BEAR BRANCH 2 · 1518565

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5025652
    NORTH EAGLE MINE · 4608759

    30 CFR 75.512 · $165.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5025651
    NORTH EAGLE MINE · 4608759

    30 CFR 75.512 · $165.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5024137
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  21. Mobile equipment; automatic warning devices.

    violationRecord 5090165
    Flying Eagle · 4609471

    30 CFR 77.410(a)(1) · $151.00 proposed penalty

  22. Loading and haulage equipment; installations.

    violationRecord 5090164
    Flying Eagle · 4609471

    30 CFR 77.1605(a) · $2,312.00 proposed penalty

  23. Quantity and location of firefighting equipment.

    violationRecord 5090163
    Flying Eagle · 4609471

    30 CFR 77.1109(e)(1) · $313.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5020343
    Winchester 2 · 4609615

    30 CFR 75.370(d) · $366.00 proposed penalty

  25. Quarterly sampling; designated areas.

    violationRecord 5025135
    COAL BRANCH NO. 2 · 4609663

    30 CFR 70.209(a) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.