← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5025098
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  2. Escapeways; bituminous and lignite mines.

    violationRecord 5025097
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(iv) · $226.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5025096
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.202(a) · $151.00 proposed penalty

  4. Preshift examination at fixed intervals.

    violationRecord 5025094
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.360(g) · $209.00 proposed penalty

  5. Preshift examination at fixed intervals.

    violationRecord 5026234
    Speed Mine · 4605437

    30 CFR 75.360(f) · $193.00 proposed penalty

  6. Explosives, handling and use.

    violationRecord 5025735
    Samples Surface Mine · 4607178

    30 CFR 77.1303(c) · $151.00 proposed penalty

  7. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5025823
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1106-3(a)(2) · $313.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9841419
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.400 · $165.00 proposed penalty

  9. Handtools (nonpowered)

    accidentRecord 220252390012
    Winchester Peerless Rachel Mine · 4609258

    Days away from work only

    Accident narrative

    Employee at 2 East Belt take-up found rope fouled in sheave. While using 3/4-ton chain ratchet on roof bolt plate, the plate eye broke, causing a fall and left knee injury. Later diagnosed with torn ACL. Employee continued normal duties until 8/26/2025, when they went off for surgery. First missed shift 8/26/2025. Claimed as NFDL.

  10. Verbal Hazard Complaint Inspections

    inspectionRecord 6321486
    Speed Mine · 4605437

    7.0 on-site hours reported

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778764
    No. 76 Plant · 1516520

    30 CFR 77.1606(c) · $151.00 proposed penalty

  12. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9779776
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1910(j) · $226.00 proposed penalty

  13. Preshift examination at fixed intervals.

    violationRecord 9778993
    BEAR BRANCH 2 · 1518565

    30 CFR 75.360(g) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  14. Weekly examination.

    violationRecord 9778992
    BEAR BRANCH 2 · 1518565

    30 CFR 75.364(b)(2) · $226.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 9778991
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $465.00 proposed penalty

  16. Refuge alternatives.

    violationRecord 9778990
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1506(g) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  17. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778940
    East Mac & Nellie · 1518966

    30 CFR 77.1606(c) · $151.00 proposed penalty

  18. Loading and haulage equipment; installations.

    violationRecord 9778682
    East Mac & Nellie · 1518966

    30 CFR 77.1605(b) · $151.00 proposed penalty

  19. Quantity and location of firefighting equipment.

    violationRecord 9778681
    East Mac & Nellie · 1518966

    30 CFR 77.1109(c)(1) · $151.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8377582
    East Mac & Nellie · 1518966

    30 CFR 77.1606(c) · $818.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5023981
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  22. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025734
    Samples Surface Mine · 4607178

    30 CFR 77.1606(c) · $465.00 proposed penalty

  23. Loading and haulage equipment; installations.

    violationRecord 5025733
    Samples Surface Mine · 4607178

    30 CFR 77.1605(d) · $288.00 proposed penalty

  24. Violation — cited standard not reported

    violationRecord 5025822
    NORTH EAGLE MINE · 4608759

    $3,014.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5025642
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.