Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Surface installations; general.

    violationRecord 5025279
    Rocklick Preparation Plant · 4606448

    30 CFR 77.200 · $1,550.00 proposed penalty

  2. Surface installations; general.

    violationRecord 5025278
    Rocklick Preparation Plant · 4606448

    30 CFR 77.200 · $1,550.00 proposed penalty

  3. Additional self-contained self-rescuers (SCSRs).

    violationRecord 5025827
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1714-4(e) · $2,712.00 proposed penalty

  4. Electric equipment; examination, testing and maintenance.

    violationRecord 5025657
    NORTH EAGLE MINE · 4608759

    30 CFR 75.512 · $288.00 proposed penalty

  5. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5025656
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1107-1(a)(3)(ii) · $209.00 proposed penalty

  6. Diesel equipment inventory.

    violationRecord 9838163
    Flying Eagle · 4609471

    30 CFR 72.520(b) · $151.00 proposed penalty

  7. Diesel equipment inventory.

    violationRecord 9838162
    Flying Eagle · 4609471

    30 CFR 72.520(b) · $151.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F000383
    NO. 77 · 1509636

    103(i) · 6.0 on-site hours reported

  9. Spot Inspections

    inspectionRecord F005849
    Speed Mine · 4605437

    103(i) · 7.0 on-site hours reported

  10. Spot Inspections

    inspectionRecord F00FEF5
    NORTH EAGLE MINE · 4608759

    103(i) · 5.0 on-site hours reported

  11. Spot Inspection

    inspectionRecord F026027
    Flying Eagle · 4609471

    4.0 on-site hours reported

  12. Methane monitors.

    violationRecord 5025136
    Speed Mine · 4605437

    30 CFR 75.342(a)(4) · $755.00 proposed penalty

  13. Loading and haulage equipment; operation.

    violationRecord 5025328
    Rocklick Preparation Plant · 4606448

    30 CFR 77.1607(p) · $398.00 proposed penalty

  14. Surface installations; general.

    violationRecord 5025277
    Rocklick Preparation Plant · 4606448

    30 CFR 77.200 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 5025276
    Rocklick Preparation Plant · 4606448

    30 CFR 77.400(d) · $1,818.00 proposed penalty

  16. Openings in surface installations; safeguards.

    violationRecord 5025275
    Rocklick Preparation Plant · 4606448

    30 CFR 77.204 · $1,320.00 proposed penalty

  17. Travelways at surface installations.

    violationRecord 5025274
    Rocklick Preparation Plant · 4606448

    30 CFR 77.205(a) · $1,679.00 proposed penalty

  18. Electric equipment; examination, testing, and maintenance.

    violationRecord 5025273
    Rocklick Preparation Plant · 4606448

    30 CFR 77.502 · $398.00 proposed penalty

  19. Electric equipment; examination, testing, and maintenance.

    violationRecord 5025272
    Rocklick Preparation Plant · 4606448

    30 CFR 77.502 · $398.00 proposed penalty

  20. Dust accumulations in surface installations.

    violationRecord 5025271
    Rocklick Preparation Plant · 4606448

    30 CFR 77.202 · $6,540.00 proposed penalty

  21. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025270
    Rocklick Preparation Plant · 4606448

    30 CFR 77.1606(c) · $1,968.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 5025655
    NORTH EAGLE MINE · 4608759

    30 CFR 75.512 · $165.00 proposed penalty

  23. Fire suppression devices; approved components; installation requirements.

    violationRecord 5025654
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1107-3(d) · $151.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5025653
    NORTH EAGLE MINE · 4608759

    30 CFR 75.512 · $165.00 proposed penalty

  25. Machinery

    accidentRecord 220251680023
    NORTH EAGLE MINE · 4608759

    Accident only

    Accident narrative

    The electronic tracking system became inoperative at approximately 8:00 p.m. on 6/16/2025 from 9 North to the #2 Section in the Track and Intake Entries. Manual tracking procedures are in place, and troubleshooting efforts are underway to resolve the issue.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.