Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Preshift examination at fixed intervals.
EAGLE #3 MINE · 460942730 CFR 75.360(g) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Speed Mine · 46054378.5 on-site hours reported
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
BEAR BRANCH 2 · 151856530 CFR 75.1714-3(d) · $177.00 proposed penalty
Communications facilities; refuge alternatives.
BEAR BRANCH 2 · 151856530 CFR 75.1600-3(a)(1) · $177.00 proposed penalty
Escapeways; bituminous and lignite mines.
BEAR BRANCH 2 · 151856530 CFR 75.380(d)(7)(iii) · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
BEAR BRANCH 2 · 151856530 CFR 75.202(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $336.00 proposed penalty
Quantity and location of firefighting equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1100-2(f) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Speed Mine · 460543730 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Other safeguards.
Speed Mine · 460543730 CFR 75.1403 · $6,540.00 proposed penalty
Other safeguards.
Speed Mine · 460543730 CFR 75.1403 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $549.00 proposed penalty
Handling of materials
Calvary No 81 · 1512753Days away from work only
Accident narrative
Injured and another employee was putting a set of scoop batteries on charge. Injured bent over to pick up the female end of the jumper cable when upon doing so, they felt a pain in their back going down right leg. We were not informed of the results from the specialist until 08/28/2025.
Spot Inspections
Speed Mine · 4605437103(i) · 4.0 on-site hours reported
Mine ventilation plan; submission and approval.
NO. 77 · 150963630 CFR 75.370(a)(1) · Significant and substantial (S&S) · $697.00 proposed penalty
Roof testing and scaling.
Calvary No 81 · 151275330 CFR 75.211(c) · $151.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $336.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $165.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $165.00 proposed penalty
Roof testing and scaling.
Maple Eagle No. 1 Mine · 460423630 CFR 75.211(d) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $336.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $336.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(b)(5) · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.