Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 4.5 on-site hours reported
Mechanical equipment guards.
Rocklick Preparation Plant · 460644830 CFR 77.400(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(e) · $1,320.00 proposed penalty
Mechanical equipment guards.
Rocklick Preparation Plant · 460644830 CFR 77.400(d) · $1,126.00 proposed penalty
Accumulations of combustible materials.
Rocklick Preparation Plant · 460644830 CFR 77.1104 · $398.00 proposed penalty
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 10.0 on-site hours reported
Regular Safety and Health Inspection
Toms Fork Prep Plant and Loadout · 460846582.3 on-site hours reported
Drilling; general.
Combs Branch Job · 151688330 CFR 77.1007(b) · $3,448.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $151.00 proposed penalty
Surface installations; general.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.200 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Loading and haulage equipment; installations.
Rocklick Preparation Plant · 460644830 CFR 77.1605(k) · $398.00 proposed penalty
Loading and haulage equipment; installations.
Rocklick Preparation Plant · 460644830 CFR 77.1605(k) · $398.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Rocklick Preparation Plant · 460644830 CFR 77.502 · Significant and substantial (S&S) · $6,540.00 proposed penalty
Dust accumulations in surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.202 · $6,037.00 proposed penalty
Mechanical equipment guards.
Rocklick Preparation Plant · 460644830 CFR 77.400(d) · $1,679.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(a) · $1,679.00 proposed penalty
Additional self-contained self-rescuers (SCSRs).
NORTH EAGLE MINE · 460875930 CFR 75.1714-4(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Violation — cited standard not reported
NORTH EAGLE MINE · 4608759$3,014.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 4.0 on-site hours reported
Health Technical Investigation
Flying Eagle · 46094717.8 on-site hours reported
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(b) · $1,679.00 proposed penalty
Surface installations; general.
Rocklick Preparation Plant · 460644830 CFR 77.200 · $1,550.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.