← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Handling of materials

    accidentRecord 220252340033
    Samples Surface Mine · 4607178

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee stated they were installing an exhaust on a D10 dozer. Employee stated while looking up to watch what they were doing they felt some debris fall down on their sleeves, forehead and neck. Employee stated they felt discomfort in right eye when they got home to wash their face. Employee did seek medical treatment. Prescribed eye drops.

  2. Accumulation of combustible materials.

    violationRecord 9774937
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $465.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5022861
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  4. Other safeguards.

    violationRecord 5022860
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  5. Other safeguards.

    violationRecord 5022859
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  6. Other safeguards.

    violationRecord 5022858
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  7. Escapeways; bituminous and lignite mines.

    violationRecord 5022856
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(1) · $1,818.00 proposed penalty

  8. Escapeways; bituminous and lignite mines.

    violationRecord 5022855
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(vi) · $398.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9847406
    Speed Mine · 4605437

    30 CFR 75.400 · $592.00 proposed penalty

  10. Rock dusting.

    violationRecord 9847405
    Speed Mine · 4605437

    30 CFR 75.402 · $151.00 proposed penalty

  11. Hazard training.

    violationRecord 5025368
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 48.31(d) · $336.00 proposed penalty

  12. Escapeways; bituminous and lignite mines.

    violationRecord 5022854
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty

  13. Ventilation controls.

    violationRecord 5022853
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(c)(2) · $1,037.00 proposed penalty

  14. Other safeguards.

    violationRecord 5022852
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $2,503.00 proposed penalty

  15. Escapeways; bituminous and lignite mines.

    violationRecord 5022851
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(1) · $1,550.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5022850
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $818.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F00C75B
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 5.0 on-site hours reported

  18. Protective clothing; requirements.

    violationRecord 9840122
    COAL BRANCH NO. 2 · 4609663

    30 CFR 77.1710(g) · Significant and substantial (S&S) · $3,022.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F0142B3
    NO. 77 · 1509636

    103(i) · 4.5 on-site hours reported

  20. Spot Inspections

    inspectionRecord F00672A
    Speed Mine · 4605437

    103(i) · 5.8 on-site hours reported

  21. Changes in electric system map; recording.

    violationRecord 5022849
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.508-2 · $151.00 proposed penalty

  22. Methane monitors.

    violationRecord 5026260
    Speed Mine · 4605437

    30 CFR 75.342(a)(4) · $592.00 proposed penalty

  23. Roof testing and scaling.

    violationRecord 5023567
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.211(d) · $151.00 proposed penalty

  24. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5024153
    Coal Branch No.1 Mine · 4609588

    30 CFR 75.1107-1(b) · $366.00 proposed penalty

  25. Deenergization of self-propelled electric face equipment; performance requirements.

    violationRecord 5024152
    Coal Branch No.1 Mine · 4609588

    30 CFR 75.523-2(a)(1) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.