Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Coal Clean Prep Plant · 460857130 CFR 50.20(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.400 · $504.00 proposed penalty
Mechanical equipment guards.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.1722(a) · $432.00 proposed penalty
Weekly examination.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.364(h) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Branch No.1 Mine · 460958830 CFR 77.1606(c) · $245.00 proposed penalty
Regular Safety and Health Inspection
Freelandville Mine · 120216710.8 on-site hours reported
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 7.0 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.5 on-site hours reported
Loading and haulage equipment; installations.
NO. 77 · 150963630 CFR 77.1605(d) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Calvary No 81 · 151275330 CFR 75.1731(a) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.512 · $336.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
BEAR BRANCH 2 · 151856530 CFR 75.701 · $226.00 proposed penalty
Cable fittings; suitability.
Speed Mine · 460543730 CFR 75.515 · $288.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $549.00 proposed penalty
Travelways at surface installations.
Speed Mine · 460543730 CFR 77.205(e) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
NORTH EAGLE MINE · 460875930 CFR 75.1101-10 · $697.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
NORTH EAGLE MINE · 460875930 CFR 75.1106-3(a)(2) · $209.00 proposed penalty
Accumulation of combustible materials.
NORTH EAGLE MINE · 460875930 CFR 75.400 · $313.00 proposed penalty
Installation of water sprinkler systems; requirements.
NORTH EAGLE MINE · 460875930 CFR 75.1101-7(b) · $209.00 proposed penalty
Other safeguards.
NORTH EAGLE MINE · 460875930 CFR 75.1403 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NORTH EAGLE MINE · 460875930 CFR 75.1731(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
NORTH EAGLE MINE · 460875930 CFR 75.370(a)(1) · $209.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Glancy Surface Mine · 460937730 CFR 77.1606(c) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Accumulation of combustible materials.
Winchester 2 · 460961530 CFR 75.400 · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.