Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof testing and scaling.
Maple Eagle No. 1 Mine · 460423630 CFR 75.211(d) · $151.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $755.00 proposed penalty
On-shift examination.
Maple Eagle No. 1 Mine · 460423630 CFR 75.362(a)(1) · $1,037.00 proposed penalty
Mechanical equipment guards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1722(b) · $2,312.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $3,184.00 proposed penalty
Mechanical equipment guards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1722(b) · $209.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $2,503.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1101-10 · $151.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $209.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(1) · $1,550.00 proposed penalty
Protection from falls of roof, face and ribs.
Maple Eagle No. 1 Mine · 460423630 CFR 75.202(a) · $1,968.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Cable fittings; suitability.
Speed Mine · 460543730 CFR 75.515 · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
Speed Mine · 460543730 CFR 75.503 · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $151.00 proposed penalty
Accumulation of combustible materials.
Winchester Peerless Rachel Mine · 460925830 CFR 75.400 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Winchester Peerless Rachel Mine · 460925830 CFR 75.517 · $151.00 proposed penalty
Clamping of trailing cables to equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 75.605 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1725(a) · $165.00 proposed penalty
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $151.00 proposed penalty
Roof control plan.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Roof control plan.
EAGLE #3 MINE · 460942730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Methane monitors.
EAGLE #3 MINE · 460942730 CFR 75.342(a)(4) · $432.00 proposed penalty
Installation of high-voltage transmission cables.
EAGLE #3 MINE · 460942730 CFR 75.807 · $883.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.