Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $288.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(1) · $1,818.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(7)(vi) · $398.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $592.00 proposed penalty
Rock dusting.
Speed Mine · 460543730 CFR 75.402 · $151.00 proposed penalty
Hazard training.
Toms Fork Prep Plant and Loadout · 460846530 CFR 48.31(d) · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(c)(2) · $1,037.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $2,503.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(1) · $1,550.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $818.00 proposed penalty
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 5.0 on-site hours reported
Protective clothing; requirements.
COAL BRANCH NO. 2 · 460966330 CFR 77.1710(g) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Spot Inspections
NO. 77 · 1509636103(i) · 4.5 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.8 on-site hours reported
Changes in electric system map; recording.
Maple Eagle No. 1 Mine · 460423630 CFR 75.508-2 · $151.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $592.00 proposed penalty
Roof testing and scaling.
Winchester Peerless Rachel Mine · 460925830 CFR 75.211(d) · $151.00 proposed penalty
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 5.0 on-site hours reported
Accumulation of combustible materials.
Calvary No 81 · 151275330 CFR 75.400 · $245.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.