Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
Winchester 2 · 460961530 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Spot Inspections
NO. 77 · 1509636103(i) · 5.0 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 7.0 on-site hours reported
Mine ventilation plan; submission and approval.
NO. 77 · 150963630 CFR 75.370(a)(1) · $226.00 proposed penalty
Temporary notations, revisions, and supplements.
Speed Mine · 460543730 CFR 75.1202 · $151.00 proposed penalty
Regular Safety and Health Inspection
Coal Clean Prep Plant · 460857188.0 on-site hours reported
Verbal Hazard Complaint Inspections
Winchester Peerless Rachel Mine · 46092587.5 on-site hours reported
Ventilation controls.
Calvary No 81 · 151275330 CFR 75.333(b)(2) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Calvary No 81 · 151275330 CFR 75.202(a) · $177.00 proposed penalty
Electrical components; permissibility requirements.
BEAR BRANCH 2 · 151856530 CFR 75.1103-7(a) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
BEAR BRANCH 2 · 151856530 CFR 75.370(a)(1) · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $432.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(7)(iii) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(7)(vii)(B) · $398.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(7)(vii) · $398.00 proposed penalty
Roof bolting.
Maple Eagle No. 1 Mine · 460423630 CFR 75.204(c)(1) · $267.00 proposed penalty
Approval of other fire suppression devices.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1107-13(g) · $177.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $642.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(1) · $165.00 proposed penalty
Condition and examination of firefighting equipment.
Speed Mine · 460543730 CFR 75.1100-3 · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $504.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Coal Clean Prep Plant · 460857130 CFR 50.20(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.400 · $504.00 proposed penalty
Mechanical equipment guards.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.1722(a) · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.