Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $1,320.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $336.00 proposed penalty
Methane monitors.
Maple Eagle No. 1 Mine · 460423630 CFR 75.342(a)(4) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $4,749.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $4,383.00 proposed penalty
Violation — cited standard not reported
Maple Eagle No. 1 Mine · 4604236$2,782.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(1) · $1,037.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · $5,144.00 proposed penalty
Ground control; inspection and maintenance; general.
Samples Surface Mine · 460717830 CFR 77.1004(b) · $313.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Mechanical equipment guards.
Coal Clean Prep Plant · 460857130 CFR 77.400(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Loading and haulage equipment; installations.
Coal Clean Prep Plant · 460857130 CFR 77.1605(k) · $151.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Mechanical equipment guards.
Coal Clean Prep Plant · 460857130 CFR 77.400(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Loading and haulage equipment; installations.
Coal Clean Prep Plant · 460857130 CFR 77.1605(d) · $151.00 proposed penalty
Experienced miner training.
Coal Clean Prep Plant · 460857130 CFR 48.26(b) · $151.00 proposed penalty
Experienced miner training.
Coal Clean Prep Plant · 460857130 CFR 48.26(b) · $168.00 proposed penalty
Mechanical equipment guards.
Coal Clean Prep Plant · 460857130 CFR 77.400(b) · Significant and substantial (S&S) · $398.00 proposed penalty
Spot Inspections
NO. 77 · 1509636103(i) · 6.0 on-site hours reported
Spot Inspection
South Hollow Prep Plant and Loadout · 46030853.0 on-site hours reported
Verbal Hazard Complaint Inspections
Maple Eagle No. 1 Mine · 460423666.0 on-site hours reported
Verbal Hazard Complaint Inspections
Maple Eagle Preparation Plant · 460514515.0 on-site hours reported
Verbal Hazard Complaint Inspections
Speed Mine · 46054378.0 on-site hours reported
Verbal Hazard Complaint Inspections
Sycamore Surface Mine · 460705821.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.