Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mechanical equipment guards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1722(b) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,320.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,320.00 proposed penalty
Availability of approved self-rescue devices; instruction in use and location.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1714(a) · $151.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 4.0 on-site hours reported
Verbal Hazard Complaint Inspections
Coal Clean Prep Plant · 460857122.8 on-site hours reported
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 6.0 on-site hours reported
Spot Inspection
Winchester Peerless Rachel Mine · 46092582.5 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
East Mac & Nellie · 151896630 CFR 77.1606(c) · $398.00 proposed penalty
Protection from falls of roof, face and ribs.
Maple Eagle No. 1 Mine · 460423630 CFR 75.202(a) · $1,320.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $1,126.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $1,320.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $504.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $336.00 proposed penalty
Methane monitors.
Maple Eagle No. 1 Mine · 460423630 CFR 75.342(a)(4) · $4,047.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $4,749.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $4,383.00 proposed penalty
Violation — cited standard not reported
Maple Eagle No. 1 Mine · 4604236$2,782.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(1) · $1,037.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · $5,144.00 proposed penalty
Ground control; inspection and maintenance; general.
Samples Surface Mine · 460717830 CFR 77.1004(b) · $313.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Mechanical equipment guards.
Coal Clean Prep Plant · 460857130 CFR 77.400(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Loading and haulage equipment; installations.
Coal Clean Prep Plant · 460857130 CFR 77.1605(k) · $151.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.