← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Preshift examination at fixed intervals.

    violationRecord 9847417
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.360(f) · $151.00 proposed penalty

  2. Roof bolting.

    violationRecord 9847416
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  3. Fall of roof or back

    accidentRecord 220253170328
    BEAR BRANCH 2 · 1518565

    Accident only

    Accident narrative

    A roof fall occurred in the belt entry on the 3 Northwest Submains. It is approximately 120' x 19' x 5-8'.

  4. Slip or fall of person

    accidentRecord 220253170135
    Winchester Peerless Rachel Mine · 4609258

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was walking down #1 Entry when EE tripped over gob on the mine floor, fell toward the rib, and struck EE's right fifth digit on an installed rib bolt, causing a laceration. EE returned to work, sought medical attention after shift, received four sutures, and returned on 10/08/2025 to normal duties. Medical Treatment Only.

  5. Spot Inspections

    inspectionRecord F010761
    BEAR BRANCH 2 · 1518565

    103(i) · 8.5 on-site hours reported

  6. Non-Injury Accident Investigation

    inspectionRecord F010762
    BEAR BRANCH 2 · 1518565

    21.5 on-site hours reported

  7. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5084410
    NO. 77 · 1509636

    30 CFR 75.1101-10 · $165.00 proposed penalty

  8. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5084003
    NO. 77 · 1509636

    30 CFR 75.1600-2(b) · $165.00 proposed penalty

  9. Ventilation controls.

    violationRecord 5081877
    Calvary No 81 · 1512753

    30 CFR 75.333(b)(3) · $151.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 9778969
    BEAR BRANCH 2 · 1518565

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  11. Violation — cited standard not reported

    violationRecord 9778968
    BEAR BRANCH 2 · 1518565
  12. Escapeways; bituminous and lignite mines.

    violationRecord 9779133
    BEAR BRANCH 2 · 1518565

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  13. Permissible electric face equipment; maintenance.

    violationRecord 5029822
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.503 · $313.00 proposed penalty

  14. On-shift examination.

    violationRecord 5029821
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  15. Inspection of fire suppression devices.

    violationRecord 5029022
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-16(b) · $193.00 proposed penalty

  16. Machinery and equipment; operation and maintenance.

    violationRecord 5029021
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1725(a) · $209.00 proposed penalty

  17. Drill dust control at underground areas of underground mines.

    violationRecord 5024020
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 72.630(b) · $313.00 proposed penalty

  18. Ventilation controls.

    violationRecord 5025009
    Speed Mine · 4605437

    30 CFR 75.333(d)(3) · $177.00 proposed penalty

  19. Loading and haulage equipment; installations.

    violationRecord 5026146
    EAGLE #3 MINE · 4609427

    30 CFR 77.1605(d) · $151.00 proposed penalty

  20. Loading and haulage equipment; installations.

    violationRecord 5026145
    EAGLE #3 MINE · 4609427

    30 CFR 77.1605(b) · $151.00 proposed penalty

  21. Automatic emergency-parking brakes.

    violationRecord 5026144
    EAGLE #3 MINE · 4609427

    30 CFR 75.523-3(c)(2) · $151.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5097906
    Flying Eagle · 4609471

    30 CFR 75.400 · $7,676.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5097905
    Flying Eagle · 4609471

    30 CFR 75.400 · $697.00 proposed penalty

  24. First-aid equipment; location; minimum requirements.

    violationRecord 5025862
    Winchester 2 · 4609615

    30 CFR 75.1713-7(c) · $245.00 proposed penalty

  25. Power wires and cables; insulation and protection.

    violationRecord 5025861
    Winchester 2 · 4609615

    30 CFR 75.517 · Significant and substantial (S&S) · $2,712.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.