← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 5029034
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(c)(3) · $209.00 proposed penalty

  2. Escapeways; bituminous and lignite mines.

    violationRecord 5028673
    Speed Mine · 4605437

    30 CFR 75.380(d)(7)(iii) · $177.00 proposed penalty

  3. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5028672
    Speed Mine · 4605437

    30 CFR 75.1107-9(a)(1) · $193.00 proposed penalty

  4. Mechanical equipment guards.

    violationRecord 5025763
    Samples Surface Mine · 4607178

    30 CFR 77.400(a) · $209.00 proposed penalty

  5. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025762
    Samples Surface Mine · 4607178

    30 CFR 77.1606(c) · $697.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5026292
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1725(a) · $2,712.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5026291
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.512 · $398.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5020389
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.400 · $336.00 proposed penalty

  9. Machinery and equipment; operation and maintenance.

    violationRecord 5020388
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1725(a) · $1,219.00 proposed penalty

  10. Machinery and equipment; operation and maintenance.

    violationRecord 5022910
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1725(a) · $165.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5022909
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1725(a) · $165.00 proposed penalty

  12. Roof control plan.

    violationRecord 5022908
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.220(a)(1) · $245.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5026154
    EAGLE #3 MINE · 4609427

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  14. Electric equipment; examination, testing and maintenance.

    violationRecord 5026153
    EAGLE #3 MINE · 4609427

    30 CFR 75.512 · $177.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5026152
    EAGLE #3 MINE · 4609427

    30 CFR 75.400 · $165.00 proposed penalty

  16. Ventilation controls.

    violationRecord 5027923
    Coal Branch No.1 Mine · 4609588

    30 CFR 75.333(h) · $151.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5027922
    Coal Branch No.1 Mine · 4609588

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  18. Power wires and cables; insulation and protection.

    violationRecord 5025868
    Winchester 2 · 4609615

    30 CFR 75.517 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5084416
    NO. 77 · 1509636

    30 CFR 75.512 · $267.00 proposed penalty

  20. Escapeways; bituminous and lignite mines.

    violationRecord 5084415
    NO. 77 · 1509636

    30 CFR 75.380(d)(1) · $165.00 proposed penalty

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084414
    NO. 77 · 1509636

    30 CFR 75.1731(a) · $177.00 proposed penalty

  22. Main mine fan examinations and records.

    violationRecord 5081882
    Calvary No 81 · 1512753

    30 CFR 75.312(e) · $151.00 proposed penalty

  23. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029827
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(b) · $267.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029826
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $336.00 proposed penalty

  25. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029825
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $336.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.