Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 6.5 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 7.3 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
NO. 77 · 150963630 CFR 75.1731(b) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NO. 77 · 150963630 CFR 75.1731(a) · $177.00 proposed penalty
Accumulations of combustible materials.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.1104 · $151.00 proposed penalty
Other safeguards.
NORTH EAGLE MINE · 460875930 CFR 75.1403 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
NORTH EAGLE MINE · 460875930 CFR 75.370(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
NORTH EAGLE MINE · 460875930 CFR 75.370(a)(1) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NORTH EAGLE MINE · 460875930 CFR 75.1731(a) · $267.00 proposed penalty
Storage of materials.
Winchester Peerless Rachel Mine · 460925830 CFR 77.208(d) · $209.00 proposed penalty
Quantity and location of firefighting equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 77.1109(c)(1) · $151.00 proposed penalty
Other safeguards.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.1403 · $165.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.512 · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester 2 · 460961530 CFR 75.370(a)(1) · $549.00 proposed penalty
Power wires and cables; insulation and protection.
Winchester 2 · 460961530 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Handling of materials
No. 64 Plant · 1516353No dys awy frm wrk,no rstr act
Accident narrative
While walking down an incline to clean out an obstruction in a culvert caused by beaver activity, EE took a step and felt a burning sensation in EE's left knee area. EE has worked every day since and had a procedure on 02/27/2026. EE returned to work on EE's next scheduled shift.
Handling of materials
NORTH EAGLE MINE · 4608759No dys awy frm wrk,no rstr act
Accident narrative
Employee was bolting in the #1 Entry when, while checking hole depth with a 6-ft., 0.804 diameter bolt, it slipped from left hand and smashed right ring finger between the bolt head and drill chuck. Employee self-transported to CAMC General Hospital, received four sutures, and returned to full duty on 11/13/2025.
Mobile equipment; automatic warning devices.
Kentucky River Loading · 151349530 CFR 77.410(c) · $151.00 proposed penalty
Mechanical equipment guards.
Kentucky River Loading · 151349530 CFR 77.400(a) · $151.00 proposed penalty
Protective clothing; requirements.
Samples Surface Mine · 460717830 CFR 77.1710(g) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
Winchester 2 · 460961530 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Handling of materials
Glancy Surface Mine · 4609377Days away from work only
Accident narrative
Employee was lifting a fire extinguisher up on a dozer with their right arm they swung it up onto the track then up on the hood. They completed the shift, went home and stated that they then noticed their arm didn't look right but had no pain. They reported it the next day but continued to work until 12/18/2025. They were then was taken off work to repair an upper arm injury.
Electric wiring and equipment; installation and maintenance.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.516 · $151.00 proposed penalty
Surface installations; general.
South Hollow Prep Plant and Loadout · 460308530 CFR 77.200 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.