Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Roof control plan.
Winchester Peerless Rachel Mine · 460925830 CFR 75.220(a)(1) · $165.00 proposed penalty
Quarterly sampling; mechanized mining units.
Winchester 2 · 460961530 CFR 70.208(a)(2) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1100-2(a)(1) · $226.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $697.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $697.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $697.00 proposed penalty
Travelways at surface installations.
WELLS PREP PLANT AND LOADOUT · 460529530 CFR 77.205(a) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · Significant and substantial (S&S) · $27,603.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
Speed Mine · 460543730 CFR 75.1107-9(a)(1) · $209.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
Rocklick Preparation Plant · 460644830 CFR 77.516 · $1,126.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(b) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Ground control; inspection and maintenance; general.
Samples Surface Mine · 460717830 CFR 77.1004(b) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(d) · $432.00 proposed penalty
Certification.
NORTH EAGLE MINE · 460875930 CFR 75.1201 · $151.00 proposed penalty
Mechanical equipment guards.
Winchester Peerless Rachel Mine · 460925830 CFR 77.400(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Quarterly sampling; mechanized mining units.
Blue Creek No. 1 UG Mine · 460929730 CFR 70.208(a)(2) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
Blue Creek No. 1 UG Mine · 460929730 CFR 70.208(a)(2) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Winchester 2 · 460961530 CFR 75.517 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester 2 · 460961530 CFR 75.370(a)(1) · $642.00 proposed penalty
Quarterly sampling; mechanized mining units.
Winchester 2 · 460961530 CFR 70.208(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
NO. 77 · 1509636269.5 on-site hours reported
Regular Safety and Health Inspection
Maple Eagle No. 1 Mine · 4604236396.3 on-site hours reported
Verbal Hazard Complaint Inspections
Speed Mine · 460543711.0 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 3.0 on-site hours reported
Regular Safety and Health Inspection
Winchester Peerless Rachel Mine · 4609258347.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.